Minor Irrigation Division No. 1, Aurangabad

[The Executive Engineer, Minor Irrigation Division No. 1, Aurangabad may please be contacted for the below given tenders]

Details of Tender

Arrow010.gif (528 bytes) Back

Tender Ref.  No

Name of Work

Estimated Cost (Rs in lakhs)

Earnest Money (Rs in lakhs) Time Limit Cost of Blank Tender Form Class of Registration

842/2101/26-1/08-09

Construction of Earthen Dam, Waste weir, Tail Channel and appt.works of Vangaon (Pohari) Tq. Soegaon, Dist. Aurangabad 593.03 5.94 36 Months Rs. 5000 Class II and above

827/2101/25-1/08-09

Carrying out survey and Investigations for proposed storage tank sasegaon and Banshendra,  Tq. Kannad, Dist Aurangabad) 18.72 0.19 6 Months Rs. 1000 Class V and above

826/2101/24-1/08-09

Carrying out survey and Investigations for proposed storage tank Dighi Kalegaon, Jikthan and Vairagad (Mali Wadgaon) Tq. Gangapur Dist Aurangabad) 13.15 0.14 6 Months Rs. 1000 Class V and above

820/2101/23-1/08-09

Constructional of C.D. work @ 2010 m, @ 2580 m; and @ RD 360 m for D/S Service road for Deogaon Rangari LMI Project, Tq. Kannad, Dist. Aurangabad 16.87 0.17 15 Months Rs. 1000 Class V and above

819/2101/22-1/08-09

Constructional of earthwork and structures on Minor No1. of Tail Dy. of Wakod Medium Project, Tq. Phulambri, Dist. Aurangabad 47.42 0.48 18 Months Rs. 1000 Class V and above

814/2101/5-1/08-09

Preparing Master Plan for Integrated Development and Management of Water Resources of  Middle Godavari Sub Basins and River covering a total geographical area of 17616 Sq. Km..  -- 2.0 24 Calander Months Rs. 10000

(Download Corrigendum - pdf format)

788/2101/3-1/08-09

Corrigendum :
(Earlier TRN783/2101/3-1/08-09)
Preparing a Master Plan for Integrated Development and Management of Water Resources of  Purna Sub-basins and River covering a total geographical area of 12082 Sq. Km.. 
-- 2.0 15 Months Rs. 10000

(Download Corrigendum - pdf format)

787/2101/2-1/08-09

Corrigendum :
(Earlier TRN782/2101/2-1/08-09)
Preparing Master Plan for Integrated Development and Management of Water Resources of  Pus and Arunawati Sub-basins and River covering a total geographical area of about  6,316 Sq. Km.. 
-- 2.0 15 Months Rs. 10000

(Download Corrigendum - pdf format)

783/2101/4-1/08-09

Preparing a Master Plan for Integrated Development and Management of Water Resources of  Dudhna Sub-basins and River covering a total geographical area 5170 Sq. Km..  -- 2.0 15 Months Rs. 10000

Download Tender Document - pdf format

782/2101/3-1/08-09

Preparing a Master Plan for Integrated Development and Management of Water Resources of  Purna Sub-basins and River covering a total geographical area of 12082 Sq. Km..  -- 2.0 15 Months Rs. 10000

Download Tender Document - pdf format

781/2101/2-1/08-09

Preparing Master Plan for Integrated Development and Management of Water Resources of  Pus and Arunawati Sub-basins and River covering a total geographical area of about  6,316 Sq. Km..  -- 2.0 15 Months Rs. 10000

Download Tender Document - pdf format

740/2101/21-1/08-09

Shivana Takali Medium Project Tq. Kannad - construction of cart Track Bridge on Nirgudi Nalla at Tapargaon. 31.00 0.32 6 Months Rs. 1000 Class VII and above

727/2101/20-1/08-09

Construction of Tunnel from RD 2980 to 4200 m on Left Bank Cnal of Upper Kundlika Medium Project, Tq. Wadwani, Dist. Beed. 11.97 0.12 15 Months Rs. 1000 Class V and above

723/2101/8-1/08-09

Revised:
Previous No691/2101/8-1/09-09

Construction of earthwork and structures of Tail Dystributory on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad.
39.91 40.00 18 Months Rs. 1000 Class V and above

721/2101/14-1/08-09

Construction of high level submergence box cell bridge a/c khokari river (Deogaon @ LMI project) & a/c Lendi nalla, Tq, Kannad, Dist Aurangabad 150.11 1.01 18 Months Rs. 3000 Class III and Above.

720/2101/18-1/08-09

Constructional Anti-Termite for C.E. office & premises @sinchan Bhavan premises Aurangabad & Residential quarter@ Bhagirathnagar, Aurangabad 1.40 0.02 3 Months Rs. 500 Authorised Licence for providing Anti Termite Treatment from Agril. Dept. Govt. of Maharashtra.

719/2101/--2/08-09

Appointing a Security guard at Bhagirithnagar / Tembhapuri godown. 10.50 - 24 Months Rs. 500 Relevant govt. approved security services agencies.

718/2101/--1/08-09

Modifications with furniture in the mini guest house at Haji Ali guest House, Mumbai 7.50 - 2 Months Rs. 500 Class IV and above

717/2101/13-1/08-09

Revised:
(Earlier TRN713/2101/13-1/08-09)
Drainage work @ downstream of Earthen Dam Ch 3820 m to 3890 m of Shivna Takli Medium Project, Tq Kannad.
3.84 0.04 6 Months Rs. 500 Class VII and above

714/2101/17-1/08-09

Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects mapa under G.M.I.D.C. 46.67 0.47 12 Months Rs. 1000 Experienced agencies who had carriedout same type of work done amount more than 10 lakhs

713/2101/13-1/08-09

Drainage work @ downstream of Earthen Dam Ch 3820 m to 3890 m of Shivna Takli Medium Project, Tq Kannad. 3.84 0.04 6 Months Rs. 500 Class VII and above

712/2101/16-1/08-09

Construction of Approach road and diversion road for Dhapagalwad Storage Tank , Tq Soyegaon, Dist Aurangabad. 23.24 0.24 15 Months Rs. 1000 Class V and above

711/2101/15-1/08-09

Providing and supplying of Printed Dist map of eight district of Marathwada region showing the position of Major, Medium, Minor KT Weir, Lift irrigation schemes and barrages as on 30-06-08 in size 90X 60 CM on 100 Gcm Art paper with colour etc as per sample map given (1600 nos) and Aurangabad Dist map seze 45  x 29 cm (200 nos) 3.75 0.04 2 Months Rs. 500 Experienced agency who had carried out similar type work more than Rs. 100000/- in one year

710/2101/12-1/08-09

Wakod Medium project Tq Phulambri Dist Aurangabad - Construction of C.R. Escapes on the Main Canal & V Notches on Toe Drain of Wakod Main Dam & D.O. 4 on Main Canal. 21.90 0.22 18 Months Rs. 1000 Class V and above

709/2101/7-1/08-09

Revised:
(Previous No. 692/2101/7-1/ 08-09)
Maintenance and cleaning premises of Bhagirathnagar colony and AIC premises.
3.62 0.04 12 Months Rs. 500 Class VII and above

708/2101/9-1/08-09

Revised:
(Previous No. 688/2101/9-1/ 08-09)
Tembhapuri Medium Project - Constructing of Earthwork and structure of approach road to Agriculture Land and Constructing CD works and strengthening of Internal Road of Rehabilitated village Shivarai, Tq. Gangapur, Dist. Aurangabad.
30.85 0.31 12 Months Rs. 1000 Class V and above

688/2101/9-1/08-09

Revised:
(Previous No. 688/2101/9-1/ 08-09)
Tembhapuri Medium Project - Constructing of Earthwork and structure of approach road to Agriculture Land and Constructing CD works and strengthening of Internal Road of Rehabilitated village Shivarai, Tq. Gangapur, Dist. Aurangabad.
-- 2.0 15 Months Rs. 10000

(Download Corrigendum - pdf format)

706/2101/2-1/08-09

Corrigendum:
(Previous No. 690/2101/2-1/ 08-09)
Preparing a Master Plan for Integrated Development and Management of Water Resources of  Pus and Arunawati Sub-basins. This includes area of sub basins of  Pus and Arunawati Rivers covering a total geographical area of about  6,316 Sq. Km.. 
-- 2.0 15 Months Rs. 10000

(Download Corrigendum - pdf format)

705/2101/1-1/08-09

Corrigendum:
(Previous No. 689/2101/1-1/ 08-09)
Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna & Dudhna Sub-basins. This includes  area of sub basins of Purna & Dudhna Rivers covering a total geographical area of 17252 sq. km.
-- 2.0 18 Months Rs. 10000

(Download) 
Corrigendum
  - pdf format)

704/2101/11-1/08-09

Sillegaon L.M.I. Project, Tq. Gangapur Dist Aurangabad. Balance work of drain (Earthwork & Revetment) 15.56 0.17 12 Months Rs. 1000 Class VI and above

703/2101/10-1/08-09

Survey, Planning and design of Distribution and Drainage network of command area under Tambhaouri Medium Project (Dy. 1,2,3,4,5,6,& 8 of Main Canal & Dy. No. 1,2,3 & 4 of berm canal. 24.92 0.25 12 Months Rs. 1000 Class V and above

697/2101/5-1/08-09

Revised:
(Previous No. 655/2101/5-1/ 07-08)
Construction of approach road Jaitapur Rehabilitated Gaothan to field (for farmers) of Shivnatakali Project, Tq. Kannad, Dist. Aurangabad.
8.80 0.09 12 Months Rs. 1000 Class VI and above

694/2101/4-1/08-09

Revised:
(Previous No. 562/2101/32-1/ 07-08) Construction of earthwork and structures of Dy. N01 of Main Canal Deogaon (R) L.M.I.Project, Tq. Gangapur, Dist Aurangabad.
70.63 0.71 15 Months Rs. 3000 Class IV (A) and above

693/2101/32-1/07-08

Revised:
(Previous No 562/2101/32-1/ 07-08)
Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects maps under G.M.I.D.C.
46.67 0.47 12 Months Rs. 1000 Experienced Agencies who had carriedout same type of work done amount more than 25 lakhs

692/2101/7-1/08-09

Maintenance and cleaning premises of Bhagirathnagar colony and AIC premises. 3.62 0.04 12 Months Rs. 500 Class VII and above

691/2101/8-1/08-09

Construction of earthwork and structures of Tail Dystributory on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad. 39.91 40.00 18 Months Rs. 1000 Class V and above

690/2101/2-1/08-09

Preparing a Master Plan for Integrated Development and Management of Water Resources of  Pus and Arunawati Sub-basins. This includes area of sub basins of  Pus and Arunawati Rivers covering a total geographical area of about  6,316 Sq. Km..  -- 2.0 15 Months Rs. 10000 (Download Tender Documents - pdf format)

689/2101/1-1/08-09

Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna & Dudhna Sub-basins. This includes  area of sub basins of Purna & Dudhna Rivers covering a total geographical area of 17252 sq. km. -- 2.0 18 Months Rs. 10000 (Download Tender Documents - pdf format)

688/2101/9-1/08-09

Tembhapuri Medium Project - Constructing of Earthwork and structure of approach road to Agriculture Land and Constructing CD works and strengthening of Internal Road of Rehabilitated village Shivarai, Tq. Gangapur, Dist. Aurangabad. 30.85 0.31 12 Months Rs. 1000 Class V and above

683/2101/2-2/08-09

Modified:
(Previous No 646/2101/2-2/ 08-09)
Construction of Approach Road Gut No 164/165 to Gut No 172 and CD works *(2nos) @ junction of Jaitpur Old Gaothan road to Jalgaon - Ghat Road Tal Kannad.
18.02 0.19 15 Months Rs. 1000 Class V and above

682/2101/2-1/08-09

Modified:
(Previous No 645/2101/2-1/ 08-09)
Construction of Service Road from Pendgaon- Deulgaon Bazar road to water users association chowki from Ch o t0 870 m & from ch. 870 m to 1080 m, Tal. Sillod.
22.64 0.23 15 Months Rs. 1000 Class V and above

681/2101/8-1/08-09

Construction of earthwork and structure of Tail Dy. on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad. 39.91 - 18 Months Rs. 1000 Class V and above

680/2101/7-1/08-09

Maintenance and cleaning premises of Bhagirathnagar colony and AIC premises. 3.62 0.04 12 Months Rs. 500 Class VII and above

668/2101/1-3/08-09

Modified:
(Previous No 627/2101/1-3/ 08-09)
Construction of Tail Distributory Earthwork and structures of Deopudi Main Canal, Tq. Kannad, Dist. Aurangabad.
48.56 0.49 15 Months Rs. 1000 Class V and above

667/2101/1-2/08-09

Modified:
(Previous No 626/2101/1-3/ 08-09)

Construction of Earthwork and structures on Minor No 2 of Right Bank Canal of Deolana L.M.I. Project, Tq. Kannad, Dist. Aurangabad.
48.56 0.49 15 Months Rs. 1000 Class V and above

666/2101/1-1/08-09

Modified:
(Previous No 625/2101/1-3/ 08-09)

Construction of Minor bridge on Pimpalwadi Mahalada road crossing under submergence crossing under submergence of Pimpalwadi M.I. Tank, Tq. Soegaon, Dist. Aurangabad.
48.56 0.49 15 Months Rs. 1000 Class V and above

662/2101/6-1/08-09

Shivna Takli Medium Project Construction of Chalk No 1 to 24 of R.F. Canal Part I works. 48.56 0.49 15 Months Rs. 1000 Class V and above

659/2101/4-1/08-09

Construction of earthwork and structures of Dy. N01 of Main Canal Deogaon (R) L.M.I.Project, Tq. Gangapur, Dist Aurangabad. 70.63 0.71 15 Months Rs. 3000 Class IV (A) and above

655/2101/5-1/08-09

Construction of approach road Jaitapur Rehabilitated Gaothan to field (for farmers) of Shivnatakali Project, Tq. Kannad, Dist. Aurangabad. 8.80 0.09 12 Months Rs. 1000 Class VI and above

656/2101/3-2/08-09

Construction of earthwork and structures in km 4 to 7 of Tail Dy. & Minor 1 to 3 on R.B. Canal of Shivna Takli Medium Project, Tq. Kannad, Dist Aurangabad. 123.25 1.24 18 Months Rs. 3000 Class IV and above

655/2101/3-1/08-09

Construction of earthwork and structures in km 1 to 3 of Tail Dy. on R.B. Canal of Shivna Takli Medium Project, Tq. Kannad, Dist Aurangabad. 106.99 1.07 18 Months Rs. 3000 Class IV and above

648/2101/33-1/07-08

(Re-Revised)
Construction of earthwork and structures of Tail Dy. at 5900 on main canal of Kherda L.M.I. Project, Tq. Paithan, Dist. Aurangabad
45.18 0.46 15 Months Rs. 1000 Class V and above

647/2101/1-1-1/08-09

Supply of O.P.C. 43 Grade cement confirming IS NO 8112/1989 42.00 0.42 2 Months Rs. 800 --

646/2101/2-2/08-09

Construction of Approach Road Gut No 164/165 to Gut No 172 and CD works *(2nos) @ junction of Jaitpur Old Gaothan road to Jalgaon - Ghat Road Tal Kannad. 18.02 0.19 15 Months Rs. 1000 Class V and above

645/2101/2-1/08-09

Construction of Service Road from Pendgaon- Deulgaon Bazar road to water users association chowki from Ch o t0 870 m & from ch. 870 m to 1080 m, Tal. Sillod. 22.64 0.23 15 Months Rs. 1000 Class V and above

628/2101/36/07-08

Construction of Tail Distributory Earthwork and structures of Deopudi Main Canal, Tq. Kannad, Dist. Aurangabad. 16.10 0.17 18 Months Rs. 1000 Class V and above

627/2101/1-3/08-09

Construction of Tail Distributory Earthwork and structures of Deopudi Main Canal, Tq. Kannad, Dist. Aurangabad. 23.88 0.24 15 Months Rs. 1000 Class V and above

626/2101/1-2/08-09

Construction of Earthwork and structures on Minor No 2 of Right Bank Canal of Deolana L.M.I. Project, Tq. Kannad, Dist. Aurangabad. 17.94 0.18 12 Months Rs. 1000 Class V and above

625/2101/1-1/08-09

Construction of Minor bridge on Pimpalwadi Mahalada road crossing under submergence crossing under submergence of Pimpalwadi M.I. Tank, Tq. Soegaon, Dist. Aurangabad. 23.11 0.24 12 Months Rs. 1000 Class V and above

624/2101/28-1/07-08

Revised:
Construction of earthwork and structures on Dy @ch 6040 on Main Canal of kherda LMI Project, Tq Paithan, Dist. Aurangabad
16.10 0.17 18 Months Rs. 1000 Class V and above

604/2101/36-1/07-08

Construction of earthwork and structures of Dy. 13 of Wakod M.P. Project, Tq. Phulambri Dist. Aurangabad. 16.10 0.17 18 Months Rs. 1000 Class V and above

603/2101/35-1/07-08

Revised:
Construction of approach road for bridge near Tapargaon including C.D.Work 3 no. in submergence of Shivna Takli M.P. Project Tq Kannad, Dist. Aurangabad.
24.05 0.25 15 Months Rs. 1000 Class V and above

602/2101/35-1/07-08

Construction of approach road for bridge near Tapargaon including C.D.Work 3 no. in submergence of Shivna Takli M.P. Project Tq Kannad, Dist. Aurangabad. 24.05 0.25 15 Months Rs. 1000 Class V and above

599/2101/33-1/07-08

(Revised)
Construction of earthwork and structures of Tail Dy. at 5900 on main canal of Kherda L.M.I. Project, Tq. Paithan, Dist. Aurangabad
45.18 0.46 15 Months Rs. 1000 Class V and above

598/2101/32-1/07-08

(Revised)
Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects maps under G.M.I.D.C.
46.67 0.47 12 Months Rs. 1000 Experienced Agencies who had carriedout same type of work done amount more than 25 lakhs

597/2101/34-4/07-08

(Revised)
Shivna Takli M.P.L.F. Canal Removing & Errecting New L.T. Line @ Channel 37850.
2.45 0.03 6 Months Rs. 1000 Class VII and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

596/2101/34-3/07-08

(Revised)
Bemblewadi M.I. Tank shifting of Electrical line.
5.36 0.06 6 Months Rs. 1000 Class VI and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

595/2101/34-2/07-08

(Revised)
Kaudgaon M.I. Tank shifting of Electrical line.
9.21 0.10 6 Months Rs. 1000 Class VI and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

594/2101/34-1/07-08

(Revised)
Nillod L.M.I. shifting of Electrical line in submergence.
18.61 0.19 12 Months Rs. 1000 Class V and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

576/2101/29-1/07-08

Construction of Earthen Dam waste weir and tail channel of Charu Tanda Storage Tank, Tq. Soeygaon, Dist. Aurangabad.  578.90 5.79 24 Months Rs. 5000 Class II and above

572/2101/34-4/07-08

Shivna Takli M.P.L.F. Canal Removing & Errecting New L.T. Line @ Channel 37850. 2.45 0.03 6 Months Rs. 1000 Class VII and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

571/2101/34-3/07-08

Bemblewadi M.I. Tank shifting of Electrical line. 5.36 0.06 6 Months Rs. 1000 Class VI and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

570/2101/34-2/07-08

Kaudgaon M.I. Tank shifting of Electrical line. 9.21 0.10 6 Months Rs. 1000 Class VI and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

569/2101/34-1/07-08

Nillod L.M.I. shifting of Electrical line in submergence. 18.61 0.19 12 Months Rs. 1000 Class V and above (Electrical Registration issued by Public Works Dept is necessary for this work.)

563/2101/33-1/07-08

Construction of earthwork and structures of Tail Dy. at 5900 on main canal of Kherda L.M.I. Project, Tq. Paithan, Dist. Aurangabad 45.18 0.46 15 Months Rs. 1000 Class V and above

562/2101/32-1/07-08

Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects maps under G.M.I.D.C. 46.67 0.47 12 Months Rs. 1000 Experienced Agencies who had carriedout same type of work done amount more than 25 lakhs

559/2101/30-1/07-08

Construction of approach road and Low Level causeway at Hatnoor to Tisgaon / Ghusartanda on Shivna River on submergence of Shivna Takli Medium Project, Tq. Kannad, Dist Aurangabad 64.74 0.65 12 Months Rs. 2000 Class IV-A and above

548/2101/19-1/07-08

Modified:
Construction of rehabilitation work for Sillegaon L.M.I. Project - providing Civic amenities to new gaothan at Siregaon village, Tq. Gangapur, Dist. Aurangabad
27.83 0.28 24 Months Rs. 1000 Class V and above

538/2101/28-1/07-08

Construction of earthwork and structures on Dy @ch 6040 on Main Canal of kherda LMI Project, Tq Paithan, Dist. Aurangabad 28.60 0.29 15 Months Rs. 1000 Class V and above

537/2101/27-1/07-08

Construction of minors on Left Bank Canal of Nillod M.I. Tank, Tq Sillod Dist Aurangabad 24.00 0.24 12 Months Rs. 1000 Class V and above

536/2101/26-2/07-08

Survey work and trial bore in River for construction of K.T. weir on Girja River. 2.53 0.03 6 Months Rs. 500 Class VIII and above

535/2101/26-1/07-08

Construction of Nagnath Bridge cum K.T. Weir, Tq Phulambri, Dist Aurangabad. Providing and supplying structures, steel needles of 2.16 x 0.50 m size as per detailed design and drawings. 12.20 0.12 15 Months Rs. 1000 Class VI and above

527/2101/25-1/07-08

Khari LMI project construction of bridge joining Rohila (k) and Rohila (Bk) villages, Dist. Aurangabad 16.61 0.17 12 Months Rs. 1000 Class V and above

526/2101/24-1/07-08

Video Filming of irrigation projects and preparing film including editing etc. with all leads and lifts complete as directed by Engineer-in-charge complete. 10.00 0.10 1 Months Rs. 1000 Class VI and above

524/2101/23-1/07-08

Repairs and Renovation of Govt. quarters at Bhagirath Nagar Aurangabad 15.70 0.16 15 Months Rs. 1000 Class V and above

523/2101/23-1/07-08

D/s service road at (Rd 00.00 to 2850.00 M) and C.D. work to Sillegaon M.I. Tank, Tq. Gangapur 22.84 0.23 15 Months Rs. 1000 Class V and above

522/2101/23-1/07-08

Construction of earthwork on Dy.No 2 and Dy.No 5 on main canal of Kherda L.M.I. Project, Tq. Paithan, Dist. Aurangabad 18.18 0.19 15 Months Rs. 1000 Class V and above

498/2101/22-1/07-08

Construction of Aurangabad Sillod diversion road in Dy. No 1 @ ch.no 3720 m of Wakod Medium Project LB Canal, TQ. Phulambri, Dist. Aurangabad 7.32 0.08 6 Months Rs. 1000 Class VII and above

495/2101/11-1/07-08

Construction of earthwork and structutres of Deolana Right Bank Canal of Deolana L.M.I. Project, Tq. Kannad, Dist. Aurangabad 138.42 1.37 24 Months Rs. 3000 Class IV and above

493/2101/19-1/07-08

Construction of rehabilitation work for Sillegaon L.M.I. Project - providing Civic amenities to new gaothan at Siregaon village, Tq. Gangapur, Dist. Aurangabad 27.83 0.28 24 Months Rs. 1000 Class V and above

492/2101/21-1/07-08

Construction of protection wall to Bankihola and Bhabulgaon village for Nillod LMI, Tq. Sillod, Dist. Aurangabad 44.52 0.45 15 Months Rs. 1000 Class V and above

485/2101/20-1/07-08

Shivna Takli Medium Project Construction of work open drainage at Jaitapur Village, Tq Kannad, Dist. Aurangabad 22.00 0.22 15 Months Rs. 1000 Class V and above

484/2101/18-1/07-08

Construction of Rehabilitation work for Sillegaon LMI Project Providing Civic amenities to New Gaothan at Deoli village, Tq. Gangapur, Dist. Aurangabad 15.50 0.15 15 Months Rs. 1000 Class V and above

481/2101/16-1/07-08

Maintenance of Buildings situated at Sinchan Bhavan Premises, Aurangabad 2.34 0.03 24 Months Rs. 5000 Class VII and above

479/2101/17-1/07-08

Manyad Storage Tank Tq Vaijapur, Dist Aurangabad, Metailing on Road and construction of bridges Parala-Bhadali road to Manyad Storage Tank. 46.62 0.47 12 Months Rs. 1000 Class V and above

474/2101/15-1/07-08

Construction of Primary school building water tank cum Haud & pitching to Gutters @ New Gaothan Lehwadi in rehabilitated Wakod M.P., Tq Phulambri, Dist. Aurangabad. 15.50 0.16 15 Calendar Months Rs. 1000 Class V and above

473/2101/14-1/07-08

Construction of Road crossing of outlet of Dy.No.12 of Wakod M.P. Project, Tq Phulambri, Dist. Aurangabad. 21.53 0.22 15 Calendar Months Rs. 1000 Class V and above

472/2101/13-1/07-08

Construction of of earthwork and structures of Distributory L/F canal of Rawala L.M.I. Project, Tq. Soegaon Dist. Aurangabad. 19.12 0.20 15 Calendar Months Rs. 1000 Class V and above

471/2101/12-1/07-08

Construction of Road crossing of outlet of Dy.No.1 of Wakod M.P. Project, Tq Phulambri, Dist. Aurangabad. 19.55 0.20 15 Calendar Months Rs. 1000 Class V and above

467/2101/10-1/07-08

Construction of earthwork and structures Dy No 11 of Wakod M.P. Project, Tq Phulambri, Dist. Aurangabad. 16.98 0.17 15 Calendar Months Rs. 1000 Class V and above

462/2101/9-1/07-08

Survey Planning and design of of Distribution and drainage network of command area Tembhapuru Medium Project (Dy No 7 of Main Canal), Bembwewadi MI Tank and Kaudgaon MI Tank in Aurangabad Dist. 24.86 0.25 6 Calendar Months Rs. 1000 Class V and above

461/2101/6-1/07-08

Modified:
Construction of Earthwork & Structure of main canal of Dy.@ 3300 m of HaldaJalki MI Tank, Tq Sillod, Dist. Aurangabad
22.71 0.23 15 Calendar Months Rs. 1000 Class V and above

458/2101/8-1/07-08

Approach Road of Antapur Choufully to Debhegaon in rehabillated Shivna Takli M.P. Tq. Kannad Dist. Aurangabad 15.62 0.16 15 Calendar Months Rs. 1000 Class VI and above

457/2101/7-3/07-08

Construction of open gutter of Rehabilitated village Jaitpur Shivna Takli M.P., Tq. Kannad Dist. Aurangabad 3.42 0.04 6 Calendar Months Rs. 500 Class VIII and above

456/2101/7-2/07-08

Construction of earthwork and structure from Ch 0 to 1500 m of Khari L.M.I., Tq. Kannad 12.92 0.13 6 Calendar Months Rs. 1000 Class V and above

455/2101/7-1/07-08

Construction of approach road at Ch 0 to 820 M for village Kabadyachiwadi & Construction of HPC@Ch 2280 M for service. 11.70 0.12 6 Calendar Months Rs. 1000 Class VI and above

443/2101/5-1/07-08

Pardi storage tank Tq. & Dist Aurangabad, Removation of Tali Channel & Construction of Village Protection wall. 23.53 0.24 15 Calendar Months Rs. 1000 Class V and above

442/2101/4-1/07-08

Cement grouting and drainage arrangement for reducing dampness and water logging in village Jalki (Wasai) Tq. Sillod, Dist Aurangabad 24.47 0.25 15 Calendar Months Rs. 1000 Class V and above

441/2101/3-1/07-08

Construction of Kherda Tanda to Gaon Tanda (Tq. Paithan) road under Submergence of Kherda LMI Tank, TQ, Paithan, Dist Aurangabad 15.14 0.16 15 Calendar Months Rs. 1000 Class V and above

439/2101/2-1/07-08

Construction of earthwork and structures of Dy. @ 260 m of R.F. Canal of Kherda M.I. Tq. Paithan, Dist Aurangabad 15.33 0.16 15 Calendar Months Rs. 1000 Class V and above

438/2101/1-1/07-08

Construction of earthwork and C.D. work on Minor no 1 offtake @ RD 1310 m on R/F canal for Deolana L.M.I. Tank, Tq. Kannad 15.22 0.16 15 Calendar Months Rs. 1000 Class V and above

437/2101/37-1/06-07

Construction for Maintainence and Renovation of Office & Premises of Aurangabad Irrigation Circle, Aurangabad 21.81 0.22 6 Calendar Months Rs. 1000 Class V and above

419/2101/36-3/06-07

Shivna Takli Med. Project, Tq. Kannad, dist Aurangabad, Fixation of site Name board and details of Dam on Project site 3.38 0.04 6 Calendar Months Rs. 500 Class VI  and above

418/2101/36-2/06-07

Bhalgaon K.T.Weir, Tq Phulambri, Dist Aurangabad construction of bridge and developing of guide wall 9.85 0.10 6 Calendar Months Rs. 1000 Class VI  and above

417/2101/36-1/06-07

Deolana L.M.I. Tq Kannad, dist Aurangabad work of water supply scheme affected in submergence area of Deolana L.M.I. Tank 8.99 0.09 6 Calendar Months Rs. 1000 Class VI and above

415/2101/34-1/06-07

Construction of Earthwork and structures of Dy. No 8 on Main canal of Wakod M.P. Tq, Phulambri, dist Aurangabad 17.61 0.18 18 Calendar Months Rs. 1000 Class V and above

412/2101/35-1/06-07

Construction of Bridge and approaches on Charner river for  Chrner - Pedgaon Road under submergence area of Charner M.I. tank, tq Sillod,dist Aurangabad 122.70 1.23 18 Calendar Months Rs. 3000 Class IV and above

402/2101/34-1/06-07

Construction of Earthwork and structures of Dy. No 8 on Main canal of Wakod M.P. Tq, Phulambri, dist Aurangabad 17.61 0.18 18 Calendar Months Rs. 1000 Class V and above

401/2101/33-1/06-07

Construction of Earthwork and structures on km 1 and 2 R.F. canal for Kaudgaon M.I. Tank, Tq and dist Aurangabad 37.64 0.38 18 Calendar Months Rs. 1000 Class V and above

397/2101/32-1/06-07

Construction of Earthwork and structures of Deopudi village to Kasabkheda Diversion Road, tq Kannad, Dist Aurangabad 24.02 0.25 15 Calendar Months Rs. 1000 Class V and above

390/2101/31-1/06-07

Bemblewadi M.I. Tank tq. & dist. Aurangabad. Construction of diversion road, Karmad- Pimpri - Kachner -Boregaon Road (SHW 178) km 76/300 to 76/180. 61.50 0.62 18 Calendar Months Rs. 2000 Class IV and above

388/2101/30-3/06-07

Providing and laying black topping of internal road and construction of road side Guttar in Bhagirathnagar, Aurangabad. 3.90 0.04 6 Calendar Months Rs. 500 Class VII and above

387/2101/30-3/06-07

Providing and fixing of street in Rehabilitated village at Jaitapur of STMP. 3.09 0.03 6 Calendar Months Rs. 500 Class VII and above

386/2101/30-2/06-07

Taking Trial-Bore Girja Devi Storage Tank, Tq Khultabad, Dist Aurangabad. 3.05 0.03 6 Calendar Months Rs. 500 Class VII and above

385/2101/30-1/06-07

Taking trial bore Hattinalla (Wakla) Storage Tank, Tq. Vaijpur, Dist Aurangabad. 4.90 0.05 6 Calendar Months Rs. 500 Class VII and above

384/2101/29-7/06-07

Maintenance and repairs to Sir Vishweshwariya meeting hall at Sinchan Bhavan, GMIDC, Aurangabad for two years. 2.84 0.03 6 Calendar Months Rs. 500 Class VII and above

383/2101/29-6/06-07

Construction of C.D. works C.T.B. 2 Nos in Km No 1, Dy. No 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 3.02 0.03 6 Calendar Months Rs. 500 Class VII and above

382/2101/29-5/06-07

Construction of C.D. works C.T.B. 1 Nos in Km No 1, Dy. No 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 3.02 0.05 6 Calendar Months Rs. 500 Class VII and above

381/2101/29-4/06-07

Construction of C.D. works drop 1.00m ht. 2 nos in km no 2, Dy. No 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 4.08 0.04 6 Calendar Months Rs. 500 Class VII and above

380/2101/29-3/06-07

Construction of C.D. works 2 and Road crossing in km 1 on Dy. no 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 4.53 0.05 6 Calendar Months Rs. 500 Class VII and above

379/2101/29-2/06-07

Construction of C.D. work Drop 1.00 mht. 1.50 km Ht on km No 1, Dy No 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 4.79 0.05 6 Calendar Months Rs. 500 Class VII and above

378/2101/29-1/06-07

Construction of C.D. works, Head Regulator outlets 8 nos, km 1 & 2 Dy. no 1 offtake on R/F Canal for Deolana LMI Tank, Tq. Kannad 4.72 0.05 6 Calendar Months Rs. 500 Class VII and above

369/2101/27-2/06-07

Construction of earthwork and structures on R/F Canal Dy. No. 1 Wakod M.P. Tq. Phulambri, Dist. Aurangabad 7.41 0.08 6 Calendar Months Rs. 1000 Class VI and above

368/2101/27-1/06-07

Construction of earthwork and structures on R/F Canal Dy. No. 1 Wakod M.P. Tq. Phulambri, Dist. Aurangabad 9.74 0.10 6 Calendar Months Rs. 1000 Class VI and above

362/2101/26-3/06-07

Taking Trial bores on Dam line of Saighavan storage Tank , Kannad, Dist Aurangabad 1.84 0.02 6 Calendar Months Rs. 500 Class VIII and above

361/2101/26-2/06-07

Construction of Grampanchayat office at Rehabilitataed Village Deolo Sillegaon L.M.I., Tq. Kannad, Dist Aurangabad. 5.95 0.06 6 Calendar Months Rs. 1000 Class VI and above

360/2101/26-1/06-07

Construction of Open Gattar and internal road of Rehabilitation village Jaitpur Shivna Takli M.P. Tq. Kannad, Dist, Aurangabad. 14.68 0.15 6 Calendar Months Rs. 1000 Class VI and above

359/2101/25-1/06-07

Construction of earthwork and Structures of Dy. @ 3200 m.r.f./ cANAL OF l.m.i. tQ, PAITHAN, Dist. Aurangabad. 22.00 0.22 15 Calendar Months Rs. 1000 Class V and above

355/2101/  --1/06-07

Construction and renovation at first floor of Vigilance circle, Aurangabad. 24.50 0.25 06 Calendar Months Rs. 1000 Class V and above

354/2101/23-1/06-07

Construction of earthwork and Structures of Dy. @ 3200m on main Canal of Kherda L.M.I. Project, Tq. Paithan, Dist. Aurangabad. 33.10 0.34 15 Calendar Months Rs. 1000 Class VI and above

349/2101/19-3/06-07

Construction of earthwork and guide wall of Dy. No.10 of L.B.C. Anjana Palshi M.P. Tq. Kannad, Dist. Aurangabad. 4.34 0.05 06 Calendar Months 500 Class VI and above

348/2101/19-2/06-07

Construction of earthwork and guide wall of Dy. No.10 of L.B.C. Anjana Palshi M.P. Tq. Kannad, Dist. Aurangabad. 4.99 0.05 06 Calendar Months 500 Class VI and above

347/2101/19-1/06-07

Construction of earthwork and guide wall of Dy. No.10 of L.B.C. Anjana Palshi M.P. Tq. Kannad, Dist. Aurangabad. 1.08 0.01 06 Calendar Months 500 Class IX and above

346/2101/20-1/06-07

Misc work of Godavari Marathwada Irrigation Development Corporation, Sinchan Bhavan premises, Aurangabad. 17.75 0.18` 16 Calendar Months 1000 Class V and above

345/2101/22-1/06-07

Construction of submerssible bridge across shivna River near Takli, Tq Kannad 370 M D/s of Masonry Dam of Shivna Takli Medium Project. 83.64 0.83 15 Calendar Months 2000 Class IV-A and above

338/2101/18-1/06-07

Construction of Earth works and structures of Dy. No 9 and Main Canal of Wakod Medium Project, Tq. Phulambri, Dist. Aurangabad. 19.02 0.20 16 Calendar Months 1000 Class V and above

337/2101/17-1/06-07

Construction of C.D. works along approach road and RCC drains along approach road of Jaitapur New Gaothan of Shivna Takli Medium Project, Tq, kannad, Dist. Aurangabad. 33.58 0.34 16 Calendar Months 1000 Class V and above

336/2101/16-1/06-07

Survey, Planning, Designing of Distributory network of command area of (1) Anjana Palshi Med Project, Tq. Kannad, Dist. Aurangabad. 41.49 0.42 06 Calendar Months 1000 Class V and above

335/2101/15-1/06-07

Construction of Nagnath Bridge cum K.T.Weir, Tq Phulambri, Dist. Aurangabad. 115.25 1.16 36 Calendar Months 3000 Class IV and above

315/2101/14-1/06-07

Strengthening and asphalting Balanagar Nanegaon Road (Tq. Paithan Km 22 to 25Submergence Road of Kherda L.M.I Project Tq. Paithan, Dist Aurangabad. 33.10 0.33 15 Calendar Months 1000 Class VI and above

290/2101/13-2/06-07

Construction of Distributory No 3 of Right Bank Khari LMI Tq. Kannad, Dist, Aurangabad 12.65 0.10 6 Calendar Months 1000 Class VI and above

289/2101/13-1/06-07

Repair and construction of Additional water village Tq. Kannad Purna Neopur Medium Project. 9.97 0.13 6 Calendar Months 1000 Class VI and above

270/2101/12-5/06-07

Marbolite tiles fitting of meeting hall of GMIDC, Aurangabad 4.95 0.05 6 Calendar Months 500 Class VII and above

269/2101/12-4/06-07

Furniture works and other balance works of GMIDC Meeting Hall, Aurangabad 4.70 0.05 6 Calendar Months 500 Class VII and above

268/2101/12-3/06-07

False ceiling work and decorative work of GMIDC Meeting Hall, Aurangabad 4.87 0.05 6 Calendar Months 500 Class VII and above

267/2101/12-2/06-07

Works of Sound system in GMIDC Meeting Hall, Aurangabad 4.97 0.05 6 Calendar Months 500 Class VII and above

266/2101/12-1/06-07

Electrical works and other works of GMIDC Meeting Hall, Aurangabad 4.90 0.05 6 Calendar Months 500 Class VII and above

265/2101/11-1/06-07

Supply of OPC 43 grade Cement confirming ISI No 8112/1989 38.00 0.38 2 Calendar Months 1000 -

264/2101/10-1/06-07

Construction of earthwork and CD works of distributory no 4 of left bank canal of Khari L.M.I., Tq. Kannad,  Dist. Aurangabad 12.00 0.12 6 Calendar Months 1000 Class VI and above

263/2101/9-5/06-07

Construction of Well in Viramgaon new gaothan of Wakod Medium Project, Tq. Phulambri, Dist. Aurangabad 4.99 0.05 6 Calendar Months 500 Class VII and above

262/2101/9-4/06-07

Construction of approach road to Deolana L.M.I. Tank,  Taluka Kannad, Dist. Aurangabad 4.99 0.05 6 Calendar Months 500 Class VII and above

261/2101/9-3/06-07

Construction of Gram Panchayat Building New Gaothan Shivrai tembhapuri Medium Project, Tq. Gangapur, Dist. Aurangabad 3.79 0.04 6 Calendar Months 500 Class VII and above

260/2101/9-2/06-07

Construction of approach road to outlet to Ch No 2010 to 2250 of Pimpalwadi M.I. Tank,  Taluka Soegaon Dist. Aurangabad 2.37 0.03 6 Calendar Months 500 Class VII and above

259/2101/9-1/06-07

Construction of approach road to outlet to Ch No 1500 to 2010 of Pimpalwadi M.I. Tank,  Taluka Soegaon Dist. Aurangabad 3.97 0.04 6 Calendar Months 500 Class VII and above

258/2101/6-3/06-07

Construction of Earthen Dam, Waste Weir and Tail Channel of Satal Pimpri Storage Tank, Taluka Soegaon Dist. Aurangabad 151.20 1.52 24  Calendar Months 3000 Class III and above

257/2101/6-2/06-07

Construction of Earthen Dam, Waste Weir and Tail Channel of Nimbhora Storage Tank, Taluka Soegaon Dist. Aurangabad 199.10 2.00 24  Calendar Months 3000 Class III and above

256/2101/6-1/06-07

Construction of Earthen Dam, Waste Weir and Tail Channel of Banoti Mukhed Storage Tank, Taluka Soegaon Dist. Aurangabad 151.66 1.52 24  Calendar Months 3000 Class III and above

255/2101/8-1/06-07

Construction of Balance Earthwork and structures of Km. 0 To 4 of L.B.C. of Khari L.M.I. Tank, Tq. Kannad, Dist. Aurangabad 49.03 0.50 15  Calendar Months 1000 Class V and above

254/2101/7-1/06-07

Revised:
Construction of alternative Road from Jalgaon (Ghat), Takli Road under submergence of Shivna Takli Medium Project, Tq. Kannad, Dist. Aurangabad
22.44 0.23 15  Calendar Months 1000 Class V and above

253/2101/4-1/06-07

Revised:
Construction of Balance Civil Work including piers, Deck slab and Automatic type gate of Hiradpuri Low Level Barrage, Tq. Paithan, Dist. Aurangabad