Upper Pravara Canal Division, Sangamner

[The Executive Engineer, Upper Pravara Canal Division Sangamner   may please be contacted for the below given tenders]

Details of Tender

Arrow010.gif (528 bytes) Back

Tender Ref.  No

Name of Work

Estimated Cost (Rs in Lakhs)

Earnest Money (Rs in Lakhs) Time Limit Cost of Blank Tender Form Class of Registration

1266/4105/9-1/09-10

Constructing earthwork, Structures & Lining in km 64 and 65 of Upper Pravara Left Bank Canal Tal Sangamner Dist Ahmednagar 984.91 9.84 36  Calender   Months Rs. 15000 Class I (C)

1038/4105/4-1/09-10

Preparing and providing computerised  command area map of Upper Pravara Project. 5.78 0.06 60  Calender   Months Rs. 500 -

1027/4105/5-2/09-10

Construction of Aqueduct on Adhala river @ Ch 37485 on Upper Pravara Left Bank Canal. 828.00 8.28 60  Calender   Months Rs. 15000 Class I (C)  and above

1026/4105/5-1/09-10

Construction of Aqueduct on Mhalungi river @ Ch 40590 on Upper Pravara Left Bank Canal. 843.10 8.43 60  Calender   Months Rs. 15000 Class I (C)  and above

950/4105/3-1/09-10

1. Ujani Lift Irrigation Scheme. Ranjangaon Deshmukh. Tal Kopargaon Dist Ahmednagar. Constructing Road Bridge on Ch No 55600 M on Godavari Right Bank Canal and Constructing Switchyard for Stage I & II. 28.66 0.29 8
  Calender   Months
Rs. 1000 Class V (A)  and above

885/4105/1-1/08-09

Constructing Tunnel work in Km No 59 to 63 of Upper Pravara Left Bank Canal including related earthwork. 4490.00 44.90 120
  Calender   Months
Rs. 25000 Class I (A)  and above

552/4105/1-2/07-08

Constructing Earthwork and structures in Km No 2 to 27 on Upper Pravara Right Bank Canal. 1254.37 12.54 120
  Calender   Months
Rs. 50000 Class I (A)  and above

551/4105/1-1/07-08

Constructing Earthwork and structures in Km No 1 to 18 and Tunnel Work between Km 27 & 28 on Upper Pravara Left Bank Canal. 3910.10 39.10 84
  Calender   Months
Rs. 50000 Class I (A)  and above