logotemp1.jpg (17819 bytes)


Lower Terna Canal Division No.2, Latur 
[The Executive Engineer, Lower Terna Canal Division No.2, Latur may please be contacted for the below given tenders]

Details of Tender

Arrow010.gif (528 bytes)

Back        

Tender Ref.  No

Name of Work

Estimated Cost  (Rs in Lakhs)

Earnest Money    (Rs in Lakhs) Time Limit Cost of Blank Tender Form (Rs) Class of Registration

814/2307/6-4/08-09

Construcrtion of Low Level Barrage at Takalgaon (Deola) village on Manjra River, Tq & Dist. Latur 1266.73 12.67 24 Calendar Months 5000 Class I(C) & above

810/2307/7-4/08-09

Construcrtion of Modernisation Killari-2 K.T. Weir On Terna River Tq. Ausa, Dist. Latur 634.16 6.84 24 Calendar Months 5000 Class II & above

809/2307/7-3/08-09

Construcrtion of Modernisation Mdansuri K.T. Weir On Terna River Tq. Nilanga, Dist. Latur 473.37 1.50 24 Calendar Months 5000 Class II & above

808/2307/7-2/08-09

Construcrtion of Modernisation Gunjarga K.T. Weir On Terna River Tq. Nilanga, Dist. Latur 659.88 3.00 24 Calendar Months 5000 Class II & above

807/2307/7-1/08-09

Construcrtion of Modernisation Sonkhed K.T. Weir On Terna River Tq. Nilanga, Dist. Latur 507.08 3.0 24 Calendar Months 5000 Class II & above

716/2307/2-2/08-09

Construcrtion of C.C. Lining with required earthwork of Bodka Dystributory @ RD 39270 M on Manjra Right Bank Canal & Arajkheda Distributory @ RD 71740 M on Manjra Left Bank Canal. 683.44 6.84 24 Calendar Months 5000 Class II & above

715/2307/2-1/08-09

Construcrtion of C.C. Lining with required earthwork of Isthal Dy. @ RD 7180, Wangdari Dy @ RD 38900, Pohregaon Dy. @ RD 63200 and Sangvi Distributory @RD 71540 M on Manjra Left Bank Canal.s 690.00 6.90 24 Calendar Months 5000 Class II & above

686/2307/1-1/08-09

Construction of Killari (Kawtha) K.T. Weir, Tq. Ausa, Dist. Latur. 680.75 6.81 24 Calendar Months 5000 II & above

470/2307/2-2/07-08

Repairs to Sarsa K.T. Weir, Tq. Ambajogai, Dist Beed 173.47 1.74 24 Calendar Months 3000 III & above

469/2307/2-1/07-08

Repairs to Tatborgaon K.T. Weir Cum Bridge, Tq. Kaij, Dist Beed 158.17 1.59 24
Calendar Months
3000 III & above

310/2307/4-2/06-07

Construction of WBM approach road from Kalamb road to Hingangaon. 19.00 0.19 12
Calendar Months
1000 V & above

309/2307/4-1/06-07

Construction of balance earthwork on Manjara Dam. 25.00 0.25 12
Calendar Months
1000 V & above

308/2307/3-6/06-07

Providing & fixing of boundary stone for New FRL line & Old FRL line of Manjara Project 49.00 0.49 15
Calendar Months
1000 V & above

307/2307/3-5/06-07

Providing asphalting road to top of left flank earthen dam from RD 1350 to 2929 m on Lower Terna Dam. 48.00 0.48 15
Calendar Months
1000 V & above

306/2307/3-4/06-07

Providing asphalting road to top of right flank earthen dam from RD 3273 to 4910 m on Lower Terna Dam. 47.00 0.47 15
Calendar Months
1000 V & above

305/2307/3-3/06-07

Construction of WBM approach road form Kothala pati to Ambeshwari & east Lohata to FRL 45.00 0.45 15
Calendar Months
1000 V & above

304/2307/3-2/06-07

Construction of WBM approach road form Karanjkalla to west Lohata to FRL (East & West) 43.00 0.43 15
Calendar Months
1000 V & above

303/2307/3-1/06-07

Providing & fixing of CTF on minors of Manjara Left Bank Canal & Right Bank Canal. 30.00 0.30 15
Calendar Months
1000 V & above