logotemp1.jpg (17819 bytes)


Majalgaon Canal Division No. 10, Parbhani
[The Executive Engineer, Majalgaon Canal Division No 10, Parbhani may please be contacted for the below given tenders]

Details of Tender

Arrow010.gif (528 bytes) Back

Tender Ref.  No

Name of Work

Estimated Cost (Rs in lakh)

Earnest Money (Rs in lakh) Time Limit Cost of Blank Tender Form Class of Registration

792/3303/2-3/08-09

Construction of earthwork, lining and structures of distributories and minors in km 46 to 55 of Lower Dudhna Left Bank Canal, Dist. Parbhani. 990.00 9.90 24  Months Rs. 5000 Class I-C and above 

791/3303/2-2/08-09

Construction of earthwork, lining and structures of distributories and minors in km 46 to 55 of Lower Dudhna Left Bank Canal, Dist. Parbhani. 795.00 7.95 24  Months Rs. 5000 Class I-C and above 

790/3303/2-1/08-09

Construction of earthwork, lining and structures of distributories and minors in km 38 to 45 of Lower Dudhna Left Bank Canal, Dist. Parbhani. 1462 14.62 24  Months Rs. 5000 Class I-C and above 

746/3303/1-6/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 11 to 25 of Lower Dudhna , Right Bank Canal  Dist.Parbhani 1545.00 15.45 24  Months Rs. 5000 Class I-B and above 

745/3303/1-5/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 1 to 10 of Lower Dudhna , Right Bank Canal  Dist.Parbhani 865.00 8.65 24  Months Rs. 5000 Class I-C and above 

744/3303/1-4/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 33 to 37  of Lower Dudhna , Left Bank Canal  Dist.Parbhani 920.00 9.20 24  Months Rs. 5000 Class I-C and above 

743/3303/1-3/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 28 to 32 of Lower Dudhna , Left Bank Canal  Dist.Parbhani. 880.00 8.80 24  Months Rs. 5000 Class I-C and above 

742/3303/1-2/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 16 to 27  of Lower Dudhna Left Bank Canal , Dist.Parbhani 816.00 8.16 24  Months Rs. 5000 Class I-C and above 

741/3303/1-1/08-09

Construction of Earth work, lining and structures of distributaries and minors   in km. 1 to 15 of  of Lower Dudhna Left Bank Canal, Dist.Parbhani. 825.00 8.25 24  Months Rs. 5000 Class I-C and above 

531/3303/3-4/07-08

Construction of pipe Distribution network  for Shridharjawala Lift Irrigation Scheme, Taluka.Mantha Dist. Jalna 1160.00 11.60 18  Months Rs. 5000 Class I-C and above 

530/3303/3-3/07-08

Construction of pipe Distribution network  for Koregaon Lift Irrigation Scheme, Taluka .Partur Dist. Jalna 1275.00 12.75 18  Months Rs. 5000 Class I-C and above 

529/3303/3-2/07-08

Construction of pipe Distribution network  for Satona  Lift Irrigation Scheme, Taluka. Partur Dist. Jalna

1223.00 12.23 18  Months Rs. 5000 Class I-C and above 

528/3303/3-1/07-08

Construction of pipe Distribution network  for Idoli Lift Irrigation Scheme, Taluka.Mantha Dist. Jalna 1111.00 11.11 18  Months Rs. 5000 Class I-C and above 

507/3303/2-4/07-08

Construction of Earthwork, Paver lining and structures in km 67.46 to 69 of LBC and Sadegaon Branch Canal km 1 to 5 on LBC of of Lower Dudhna Project, Dist. Parbhani. 10.34 10.34 24  Months Rs. 5000 Class I-C and above 

506/3303/2-3/07-08

Construction of Earthwork, Paver lining and structures in km 64 to 67.46 of LBC of Lower Dudhna Project, Dist. Parbhani. 9.63 9.63 24  Months Rs. 5000 Class I-C and above 

505/3303/2-2/07-08

Construction of Earthwork, Paver lining and structures in km 60 to 63 of LBC of Lower Dudhna Project, Dist. Parbhani. 9.01 9.01 24  Months Rs. 5000 Class I-C and above 

504/3303/2-1/07-08

Construction of Earthwork, Paver lining and structures in km 56 to 59 of LBC of Lower Dudhna Project, Dist. Parbhani. 9.58 9.58 24  Months Rs. 5000 Class I-C and above 

497/3303/1-1/07-08

Survey, Water Planning, Design, Alignment, Finalization and Estimate of Distribution system in Km. 06 to 55 of Lower Dudhna Left Bank Canal & Km. 11 to 45 of Lower Dudhna Right Bank Canal. 292.1 2.21 12  Months Pl. Contact Dn. Office for this Class III and above 

321/3303/4-4/06-07

Construction of Earthwork, Paver Lining and structures in km 46 to 55 of RBC of Lower Dudhna Project, Dist. Parbhani 1875 18.75 24  Months Rs. 5000 Class I (B) and above 

320/3303/4-3/06-07

Construction of Earthwork, Paver Lining and structures in km 36 to 45 of LBC of Lower Dudhna Project, Dist. Parbhani 1861 18.61 24  Months Rs. 5000 Class I (B) and above 

319/3303/4-2/06-07

Construction of Earthwork, Paver Lining and structures in km 36 to 45 of RBC with Tail Dy. of Lower Dudhna Project, Dist. Parbhani 1847 18.47 24  Months Rs. 5000 Class I (B) and above 

318/3303/4-1/06-07

Construction of Earthwork, Paver Lining and structures in km 26 to 35 of RBC of Lower Dudhna Project, Dist. Parbhani 1709 17.09 24  Months Rs. 5000 Class I (B) and above 

295/3303/1-1/06-07

Construction of Head works of Shridhar Jawala Lift Irrigation Scheme, Tq. Partur, Dist Jalna 485.19 4.85 24  Months Rs. 3000 Class II and above 

271/3303/3-1/06-07

Survey and Investigation of Sahastrakund Hydro Electric Project, Tq. Himayatnagar, Dist. Nanded 121.10 1.21 12  Months Rs. 3000 Class IV and above 

238/3303/2-4/6-07

Construction of Balance Earthwork, Paver Lining & Structures in Km 16 To 35 of L.B.C. of Lower Dudhna Project, Dist, Parbhani 3624 36.24 30  Months Rs. 5000 Class I-A 

237/3303/2-3/6-07

Construction of Balance Earthwork, Paver Lining & Structures in Km 1 To 15 of L.B.C. of Lower Dudhna Project, Dist, Parbhani 1690 16.90 30  Months Rs. 5000 Class I B And above

236/3303/2-2/6-07

Construction of Balance Earthwork, Paver Lining & Structures in Km 11 To 25 of R.B.C. of Lower Dudhna Project, Dist, Parbhani 2656 26.56 30  Months Rs. 5000 Class I A

235/3303/2-1/6-07

Construction of Balance Earthwork, Paver Lining & Structures in Km 1 To 10 of R.B.C. of Lower Dudhna Project, Dist, Parbhani 1029 10.29 24  Months Rs. 5000 Class I C And above

234/3303/1-1/6-07

Construction of Head works of Shridhar Jawala Lift Irrigation Scheme, Tq, Patur, Dist. Jalna 485.19 4.85 24  Months Rs. 3000 Class II and above

166/3303/1-3/05-06

Construction of Head works and Pressure pipe (closed conduit) Distribution System for Koregaon Lift Irrigation Scheme, Taluka, Partur, Dist. Jalna 1734.43 17.34 36  Months Rs. 5000 Class I-B and above

165/3303/1-2/05-06

Construction of Pressure pipe (closed conduit) Distribution System for SATONA (bK) Lift Irrigation Scheme, Taluka, Partur, Dist. Jalna 1072.20 10.72 36  Months Rs. 5000 Class I-C and above

164/3303/1-1/05-06

Construction of Pressure pipe (closed conduit) Distribution System for Idoli Lift Irrigation Scheme, Taluka, Mantha Dist. Jalna 2815.13 8.15 36  Months Rs. 5000 Class I-C and above