Details of Tender
| Back |
Tender Ref. No |
Name of Work |
Estimated Cost (Rs in Lakhs) |
Earnest Money (Rs in Lakhs) | Time Limit | Cost of Blank Tender Form | Class of Registration |
1339/2103/---/10-11 |
Work of Providing and fixing of Continuous Digital Weather Data Display System at the main gate of Sinchan Bhavan, Jalna Road, Surangabad. | 14.39 | 0.14 | - | Rs. 1000 | Please contact Division office |
1332/2103/1-12/10-11 |
Construction of Balance Earthwork and Structures on MR-3 of Wangargaon Branch of Dy. No 9 on N.M. canal. | 23.31 | 0.24 | 12 Months | Rs. 2000 | Class V-A And Above |
1331/2103/1-11/10-11 |
Construction of Balance Structures of Dy.No 9 and Wanjargaon Branch of Dy.No9 of N.M. canal. | 48.60 | 0.49 | 12 Months | Rs. 2000 | Class V And Above |
1330/2103/1-10/10-11 |
Construction of Balance Outlets on Dy. No 5, 6 & 8 of N.M. canal. | 44.52 | 0.45 | 12 Months | Rs. 2000 | Class V And Above |
1329/2103/1-9/10-11 |
Construction of Part-I works on N.M. Branch Canal No1 Dy. No 4, OL-1 to 5 of ML-2 | 21.18 | 0.22 | 12 Months | Rs. 2000 | Class V-A And Above |
1328/2103/1-8/10-11 |
Construction of Part-I works on Direct outlets of Dy.No 13 MR-1, MR-2, MR-3 & ML-1 of Dy No 13 of N.M. Canal. | 24.98 | 0.25 | 12 Months | Rs. 2000 | Class V-A And Above |
1327/2103/1-7/10-11 |
Construction of Part-I works on DOL-1, ML-1 & its sub minors and OL-1, OL-2, & OR-1, OR-2 on ML-2 of Dy. No. 11 of N.M. Canal. | 44.53 | 0.45 | 12 Months | Rs. 2000 | Class V And Above |
1326/2103/1-6/10-11 |
Construction of Part-I works on DOL-8 to 13 & DOR-7 to 13 and ML-4 in RD 4110 to 6700 m of Dy.No 11 of N.M. Canal. | 46.19 | 0.47 | 12 Months | Rs. 2000 | Class V And Above |
1325/2103/1-5/10-11 |
Construction of Part-I works on DOR-1 to 5 ML-3 and DOR-4 to 10 in RD 3180 to 6100 m of Wanjargaon Branch of Dy. No.9. | 42.89 | 0.43 | 12 Months | Rs. 2000 | Class V And Above |
1324/2103/1-4/10-11 |
Construction of Part-I works on IML-2, ML-3, MR-1, MR-3 and Direct Otlets in RD 1420 to 2900 m of Sawkhedganga Branch of Dy.No9 of N.M. Canal. | 46.81 | 0.47 | 12 Months | Rs. 2000 | Class V And Above |
1323/2103/1-3/10-11 |
Construction of Part-I works on Ml-3 & DOR-1 to DOR-10 & DOL-1 To DOL-7 of Dy. No 4 of N.M. Branch Canal No1. | 47.80 | 0.48 | 12 Months | Rs. 2000 | Class V And Above |
1322/2103/1-2/10-11 |
Construction of Part-I works on Dy. No 23 & ML-1, DOR-1,2 DOR 5,7,8,,10 & DOR 13 of Dy. No 24 of N.M. Canal. | 46.90 | 0.47 | 12 Months | Rs. 2000 | Class V And Above |
1321/2103/1-1/10-11 |
Construction of Part-I works of DOL -3 to DOL-9 & DOR-2 to DOR-6 & OR-1 to OR-5, OL-1 to OL-3 of ML-3 (A) on Dy. No 1 of N.M. Branch Canal No1. | 41.38 | 0.42 | 12 Months | Rs. 2000 | Class V And Above |
1278/2103/10-4/09-10 |
Construction of Part-I works in RD 1380 M To 3800 M of of ML-2 @ RD 2040 M & SML-1 to SML-4 of Dy. No. 11 of N.M. Canal | 47.98 | 0.48 | 12 Months | Rs. 2000 | Class V And Above |
1277/2103/10-3/09-10 |
Construction of Part-I works from RD 2260 M To 4010 M and ML-3 0f Dy. No 11 of N.M. Canal | 41.67 | 0.42 | 12 Months | Rs. 2000 | Class V And Above |
1276/2103/10-2/09-10 |
Construction of Part-I work on mr-2 AND mr-3 @ RD 1880 M tO 3180 M of Wanjargaon Branch of Dy. No. 9 of N.M. Canal | 40.85 | 0.41 | 12 Months | Rs. 2000 | Class V And Above |
1275/2103/10-1/09-10 |
Construction of Part-I work on DOL-1 to 3 ML-2 and SMR-1 RD 980 to 1880 M of Wanjargaon Branch of Dy. No. 9 of N.M. Canal | 32.80 | 0.33 | 12 Months | Rs. 2000 | Class V And Above |
1229/2103/8-1/09-10 |
Repairing of Sub Division office, Irrigation Section Office, and Govt. Staff Quarter@ N.M. colony@ Gangapur Dist. Aurangabad. | 23.48 | 0.24 | 8 Months | Rs. 2000 | Class V And Above |
1160/2103/7-1/09-10 |
Construction of protection wall to Kaldhondi Aquaduct @ 33120 mtr. of N.M. canal. | 23.73 | 0.24 | 12 Months | Rs. 2000 | Class V-A And Above |
1160/2103/7-1/09-10 |
Construction of protection wall to Kaldhondi Aquaduct @ 33120 mtr. of N.M. canal. | 23.73 | 0.24 | 12 Months | Rs. 2000 | Class V-A And Above |
1081/2103/5-8/09-10 |
Construction of N.M. Canal Dy No.16 sub minor 1 & 2. | 34.44 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1080/2103/5-7/09-10 |
Construction of Part-I work of N.M. Canal Dy No.5 MR-3, ML-4, 5500 mtr. to 7000 mtr. | 44.39 | 0.45 | 12 Months | Rs. 2000 | Class V And Above |
1079/2103/5-6/09-10 |
Construction of Part-I work of Dy No.4 Minor No1. | 42.04 | 0.42 | 12 Months | Rs. 2000 | Class V-A And Above |
1078/2103/5-5/09-10 |
Construction of Part-I work of Dy No.4 of N.M. Br.Canal No1. | 23.00 | 0.23 | 12 Months | Rs. 2000 | Class V-A And Above |
1077/2103/5-4/09-10 |
Construction of Part-I work of Dy No.5, ML-5,6 Direct Outlet @ 7000 mtr. to 8500 mtr. | 34.10 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1076/2103/5-3/09-10 |
Construction of Part-I work of N.M. Canal Dy No.8, Mr-I, (Kangoni Minor ) and SMR-1. | 24.98 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1075/2103/5-2/09-10 |
Construction of Part-I work of N.M. Canal Dy No.5, ML-3, Direct Outlet @ 3500 mtr. to 5500 mtr. | 37.81 | 0.38 | 12 Months | Rs. 2000 | Class V And Above |
1074/2103/5-1/09-10 |
Construction of Part-I work of N.M. Canal Dy No.5 ML-1, MR-1, MR-2. | 24.32 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1070/2103/4-5/09-10 |
Modified : (Previous Ref : 1043/2103/4-5/09-10) Construction of Direct outlet of Dy. No. 5, MR-5 & 8500 M to 12700 M of N.M. Canal. |
34.44 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1069/2103/4-4/09-10 |
Modified : (Previous Ref : 1042/2103/4-4/09-10) Construction of Part-I of DOL 1 to 6 & Tail 1 R.I. and sub Minor No R-3 of Dy. No 20 of N.M. Canal. |
44.39 | 0.45 | 12 Months | Rs. 2000 | Class V And Above |
1068/2103/4-3/09-10 |
Modified : (Previous Ref : 1041/2103/4-3/09-10) Construction of Part-I work of Dy. No 19 Sub Minor No 1 OL-1 to 4 of N.M. Canal. |
42.04 | 0.42 | 12 Months | Rs. 2000 | Class V And Above |
1067/2103/4-2/09-10 |
Modified : (Previous Ref : 1040/2103/4-1/09-10) Construction of Part-I Direct outlet of Dy. No. 9 Sawkhedganga Br. Canal @ Ch 600 m. to 1420 m and MR-I ML1 of N.M. Canal. |
23.00 | 0.23 | 12 Months | Rs. 2000 | Class V-A And Above |
1066/2103/4-1/09-10 |
Modified : (Previous Ref : 1039/2103/4-1/09-10) Construction of Part-I Direwct outlet of Dy. No. 6 Sub minor No. ML-1, MR-1 of N.M. Canal. |
34.10 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1065/2103/3-5/09-10 |
Construction of Part-I work of N.M. Branch Canal No 1 Dy No4 of N.M. Canal. | 24.98 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1064/2103/3-4/09-10 |
Modified : (Previous Ref : 1036/2103/3-4/09-10) Construction of Part-I work of Ch.1660 m to 4000 m. Direct outlet of IML-1, ML-1A, and Wangargaon Br. Canal Ch. 180 M. ML-1 of N.M. Canal. |
37.81 | 0.38 | 12 Months | Rs. 2000 | Class V And Above |
1063/2103/3-3/09-10 |
Modified : (Previous Ref : 1035/2103/3-3/09-10) Construction of Part-I work of of N.M. Branch Canal No1. |
24.32 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1062/2103/3-2/09-10 |
Modified : (Previous Ref : 1034/2103/3-2/09-10) Construction of Part-I work Dy.No 9 @ Ch. 3280 M. MR-3 and Direct Outlet of Dy. No. 9 DOR 1 @ Ch. 2120 of N.M. Canal. |
27.02 | 0.28 | 12 Months | Rs. 2000 | Class V And Above |
1061/2103/3-1/09-10 |
Modified : (Previous Ref : 1033/2103/3-1/09-10) Construction of Part-I work Direct outlet of Dy. No. 8, Sub Minor No. ML2 of N.M. Canal. |
42.31 | 0.43 | 12 Months | Rs. 2000 | Class V And Above |
1043/2103/4-5/09-10 |
Construction of Direct outlet of Dy. No. 5, MR-5 & 8500 M to 12700 M of N.M. Canal. | 34.44 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1042/2103/4-4/09-10 |
Construction of Part-I of DOL 1 to 6 & Tail 1 R.I. and sub Minor No R-3 of Dy. No 20 of N.M. Canal. | 44.39 | 0.45 | 12 Months | Rs. 2000 | Class V And Above |
1041/2103/4-3/09-10 |
Construction of Part-I work of Dy. No 19 Sub Minor No 1 OL-1 to 4 of N.M. Canal. | 42.04 | 0.42 | 12 Months | Rs. 2000 | Class V And Above |
1040/2103/4-2/09-10 |
Construction of Part-I Direct outlet of Dy. No. 9 Sawkhedganga Br. Canal @ Ch 600 m. to 1420 m and MR-I ML1 of N.M. Canal. | 23.00 | 0.23 | 12 Months | Rs. 2000 | Class V-A And Above |
1039/2103/4-1/09-10 |
Construction of Part-I Direwct outlet of Dy. No. 6 Sub minor No. ML-1, MR-1 of N.M. Canal. | 34.10 | 0.35 | 12 Months | Rs. 2000 | Class V And Above |
1037/2103/3-5/09-10 |
Construction of Part-I work of N.M. Branch Canal No 1 Dy No4 of N.M. Canal. | 24.98 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1036/2103/3-4/09-10 |
Construction of Part-I work of Ch.1660 m to 4000 m. Direct outlet of IML-1, ML-1A, and Wangargaon Br. Canal Ch. 180 M. ML-1 of N.M. Canal. | 37.81 | 0.38 | 12 Months | Rs. 2000 | Class V And Above |
1035/2103/3-3/09-10 |
Construction of Part-I work of of N.M. Branch Canal No1. | 24.32 | 0.25 | 12 Months | Rs. 2000 | Class V And Above |
1034/2103/3-2/09-10 |
Construction of Part-I work Dy.No 9 @ Ch. 3280 M. MR-3 and Direct Outlet of Dy. No. 9 DOR 1 @ Ch. 2120 of N.M. Canal. | 27.02 | 0.28 | 12 Months | Rs. 2000 | Class V And Above |
1033/2103/3-1/09-10 |
Construction of Part-I work Direct outlet of Dy. No. 8, Sub Minor No. ML2 of N.M. Canal. | 42.31 | 0.43 | 12 Months | Rs. 2000 | Class V And Above |
1006/2103/2-5/09-10 |
Construction of Part-I work of Dy. No 2 MR 2. | 52.50 | 0.43 | 12 Months | Rs. 2000 | Class V-A And Above |
1005/2103/2-4/09-10 |
Construction of Part-I work of NMC Canal Dy. No 8 Sub Minor 5 & 6 Direct Outlet and Ladgaon SubMinor ML-3. | 46.98 | 0.47 | 12 Months | Rs. 2000 | Class V-A And Above |
1004/2103/2-3/09-10 |
Construction of Part-I work of NMC Canal Dy.NO 3 & 3A. | 45.90 | 0.46 | 12 Months | Rs. 2000 | Class V-A And Above |
1003/2103/2-2/09-10 |
Construction of Part-I work of Dy. No 4 DOR 1,2,3 ML-1, MR-2 to MR-6. | 49.50 | 0.50 | 12 Months | Rs. 2000 | Class V-A And Above |
1002/2103/2-1/09-10 |
Construction of Part-I work of N.M.Canal Dy.No 25 Chack No 1 to 14. | 24.86 | 0.25 | 12 Months | Rs. 2000 | Class V-A And Above |
981/2103/6-9/09-10 |
Work of providing, fixing, Fabricating and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Shivna Road Bridge Site (A'bad Nagar Road) And providing abd fixing of Aquascan Continious digital Lake Water Data Display System at Aurangabad Flood Control Room, Aurangabad. | 34.29 | 0.34 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
980/2103/6-8/09-10 |
Work of providing, fixing and Fabricating and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Newasa - Shrirampur Road Bridge Site (Pravara River) And Sindphana Road Bridge site at Hirapur. | 33.89 | 0.34 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
979/2103/6-7/09-10 |
Work of providing, fixing and Fabricating and Maintaining of Aquascan Contineous digital River Gauging Station on line Internet Connectivity Range 0-25 Meters at Dhora Road Bridge Site (A'bad Nagar Road) And Kopargaon Bridge Site (Godavari River). | 33.89 | 0.34 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
978/2103/6-6/09-10 |
Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Raja takli Barrage And Upper Dudhna Dam And Aquascan Continious digital Raingauge with on line Internet Connectivity at Raja Takli Barragr, Ashti and Hirarpur. | 42.26 | 0.46 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
977/2103/6-5/09-10 |
Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Mangrul Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Mangrul, Kumbhar Pimpalgaon and Tirthpuri. | 31.16 | 0.37 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
976/2103/6-4/09-10 |
Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Jogla Devi Barrage And Patharwala Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Jogla Devi Barrage and Ambad. | 37.16 | 0.37 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
975/2103/6-3/09-10 |
Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Apegaon Barrage And Shivna Takli Dam site And Aquascan Continious digital Raingauge with on line Internet Connectivity at Apegaon and Aurangabad. | 37.16 | 0.37 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
974/2103/6-2/09-10 |
Work of providing, fixing and Maintaining of Aquascan Continuous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Hiradpuri Barrage And Nandurmadhmeshwar weir And Aquascan Continious digital Raingauge with on line Internet Connectivity at Nath Nagar (North) and Nath Nagar (South). | 31.16 | 0.37 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
973/2103/6-1/09-10 |
Work of providing, fixing and Maintaining of Aquascan Continuous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Shahagad Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Shahagad Barrage, Vihamandwa and Wadigodri. | 36.77 | 0.37 | 6 Months | Rs. 1500 | Bombay Shop Act, 1948 |
867/2103/2-4/08-09 |
Construction of part -I work on MR-2 of Dy. No 1 of Nandur Madhmeshwar Canal. | 42.75 | 0.43 | 15 Months | Rs. 2000 | Class-V and Above |
866/2103/2-3/08-09 |
Construction of part -I work on ML-1, MR-1, ML-2, MR-3 of Dy. No 1 of Nandur Madhmeshwar Canal. | 47.62 | 0.48 | 15 Months | Rs. 2000 | Class-V and Above |
865/2103/2-2/08-09 |
Construction of part -I work on Direct outlet No1 to 14 to 31 of Dy. No 1 of Nandur Madhmeshwar Canal. | 48.08 | 0.49 | 15 Months | Rs. 2000 | Class-V and Above |
864/2103/2-1/08-09 |
Construction of part -I work on Direct outlet No1 to 13 of Dy. No 1 of Nandur Madhmeshwar Canal. | 48.03 | 0.49 | 15 Months | Rs. 2000 | Class-V and Above |
858/2103/1-1/08-09 |
Construction of catch water Drain @Ch 1540 to 1810 Mtr @ Construction of Protection wall @ km 2 & 3 of Nandur Madhmeshwar Canal. | 48.00 | 0.48 | 14 Months | Rs. 2000 | Class-V and Above |
685/2103/11-2/07-08 |
Re-Re-Re-Modified: (Previous No 658/2103/ 11-2 07-08) Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
684/2103/11-1/07-08 |
Re-Re-Re-Modified: (Previous No 658/2103/ 11-1 07-08) Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
658/2103/11-2/07-08 |
Re-Re-Modified: Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
657/2103/11-1/07-08 |
Re-Re-Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
665/2103/11-2/07-08 |
Re-Modified: Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
664/2103/11-1/07-08 |
Re-Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
663/2103/10-2/07-08 |
Re-Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
662/2103/10-1/07-08 |
Re-Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
661/2103/9-2/07-08 |
Re-Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
660/2103/9-1/07-08 |
Re-Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
659/2103/8-2/07-08 |
Re-Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
658/2103/8-1/07-08 |
Re-Modified: Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
637/2103/11-2/07-08 |
Modified: Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
636/2103/11-1/07-08 |
Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. |
43.80 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
635/2103/10-2/07-08 |
Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16. |
46.00 | 0.46 | 10 Months | Rs. 2000 | Class-V and Above |
634/2103/10-1/07-08 |
Modified: Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14. |
44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
633/2103/9-2/07-08 |
Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17. |
48.00 | 0.48 | 10 Months | Rs. 2000 | Class-V and Above |
632/2103/9-1/07-08 |
Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25. |
43.00 | 0.43 | 10 Months | Rs. 2000 | Class-V and Above |
631/2103/8-2/07-08 |
Modified: Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21. |
43.00 | 0.43 | 10 Months | Rs. 2000 | Class-V and Above |
630/2103/8-1/07-08 |
Modified: Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2. |
46.50 | 0.47 | 10 Months | Rs. 2000 | Class-V and Above |
622/2103/11-2/07-08 |
Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. | 44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
621/2103/11-1/07-08 |
Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. | 43.80 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
620/2103/10-2/07-08 |
Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16. | 46.00 | 0.46 | 10 Months | Rs. 2000 | Class-V and Above |
619/2103/10-1/07-08 |
Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14. | 44.00 | 0.44 | 10 Months | Rs. 2000 | Class-V and Above |
618/2103/9-2/07-08 |
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17. | 48.00 | 0.48 | 10 Months | Rs. 2000 | Class-V and Above |
617/2103/9-1/07-08 |
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25. | 43.00 | 0.43 | 10 Months | Rs. 2000 | Class-V and Above |
616/2103/8-2/07-08 |
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21. | 43.00 | 0.43 | 10 Months | Rs. 2000 | Class-V and Above |
615/2103/8-1/07-08 |
Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2. | 46.50 | 0.47 | 10 Months | Rs. 2000 | Class-V and Above |
614/2103/7-1/07-08 |
Construction of earthwork and structures on Tailong of Dy. o.1 Minor and Sub Minors of Nandur Madhmeshwar Branch Canal No.2. | 45.2 | 0.46 | 10 Months | Rs. 2000 | Class-V and Above |
587/2103/6-1/07-08 |
Earthwork and structures of N.M.Canal Dy.No.5 ML-1 (A) of Tail minor and Earthwork and structure of Distributory No5 ML1. | 19.57 | 0.02 | 3 Months | Rs. 1000 | Class-V and Above |
583/2103/5-2/07-08 |
Construction of balance earthwork and structures and Earthwork in km 11 and 13 on Distributory No.1 of Branch Canal No 1 on Nandur Madhmeshwar Canal. | 56.94 | 0.57 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
582/2103/5-1/07-08 |
Construction of balance earthwork and structures and Earthwork in km 9 and 10 on Distributory No.1 of Branch Canal No 1 on Nandur Madhmeshwar Canal. | 58.22 | 0.59 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
581/2103/4-1/07-08 |
Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./ML-3. | 82.59 | 0.83 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
580/2103/3-2/07-08 |
Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./MR-3 and ML-4. | 62.90 | 0.70 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
579/2103/3-1/07-08 |
Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./ML-6,7,8. | 62.17 | 0.63 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
578/2103/2-2/07-08 |
Construction of balance structures and selective lining from km 9 to 13 on Nandur Madhmeshwar Canal Dy-5. | 56.96 | 0.57 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
577/2103/2-1/07-08 |
Construction of balance structures and selective lining from km 1 and 8 on Nandur Madhmeshwar Canal Dy-5. | 58.98 | 0.59 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
578/2103/2-2/07-08 |
Construction of balance structures and selective lining from km 9 to 13 on Nandur Madhmeshwar Canal Dy-5. | 56.96 | 0.57 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
577/2103/2-1/07-08 |
Construction of balance structures and selective lining from km 1 and 8 on Nandur Madhmeshwar Canal Dy-5. | 58.98 | 0.59 | 3 Months | Rs. 2000 | Class-IV-(A) and Above |
574/2103/1-1/07-08 |
Construction of Earthwork and structure on MR-2 and ML-3 (A) on Distributory No1 on Branch Canal No 1 of Nandur Madhmeshwar Canal. | 44.83 | 0.45 | 3 Months | Rs. 2000 | Class-V and Above |
96/2103/4-2/ 05-06 |
Extension and strengthening of Structure of N.M.Branch Canal No.2 | 37.00 | 0.49 | 12 Months | Rs. 3000 | Class-V and Above |
95/2103/4-1/ 05-06 |
Extension and strengthening of Structure of N.M.Branch Canal No.1 | 49.00 | 0.37 | 12 Months | Rs. 3000 | Class-V and Above |
94/2103/3-5/ 05-06 |
Extension and strengthening of Structure in Km. 110 To 127 of N.M.Canal | 82.00 | 0.82 | 12 Months | Rs. 3000 | Class-IV(A) and Above |
93/2103/3-4/ 05-06 |
Extension and strengthening of Structure in Km. 91 To 110 of N.M.Canal | 121.00 | 1.21 | 24 Months | Rs. 4000 | Class-IV and Above |
92/2103/3-3/ 05-06 |
Extension and strengthening of Structure in Km. 6 To 90 of N.M.Canal | 131.00 | 1.31 | 24 Months | Rs. 4000 | Class-IV and Above |
91/2103/3-2/ 05-06 |
Extension and strengthening of Structure in Km. 31 To 60 of N.M.Canal | 128.00 | 1.28 | 24 Months | Rs. 4000 | Class-IV and Above |
90/2103/3-1/ 05-06 |
Extension and strengthening of Structure in Km. 1 To 30 of N.M.Canal | 132.00 | 1.32 | 24 Months | Rs. 4000 | Class-IV and Above |
89/2103/2-3/ 05-06 |
Construction of balance C.C. Lining in Km. 81To 127 and Branch Canal No.1, km. 4 to 16 of N.M.Canal by mechanised system | 5356.00 | 53.56 | 36 Months | Rs. 10000 | Class I A |
88/2103/2-2/ 05-06 |
Construction of balance C.C. Lining in Km. 51To 80 of N.M.Canal by mechanised system | 2894.00 | 28.94 | 36 Months | Rs. 5000 | Class I A |
87/2103/2-1/ 05-06 |
Construction of balance C.C. Lining in Km. 0 To 50 of N.M.Canal by mechanised system | 3220.00 | 32.20 | 36 Months | Rs. 5000 | Class I A |