Nandur Madhmeshwar Canal Division, Vaijapur, Dist : Aurangabad

[The Executive Engineer, Nandur Madhmeshwar Canal Division, Vaijapur,
Dist. Aurangabad
may please be contacted for the below given tenders]

Details of Tender

Arrow010.gif (528 bytes) Back

Tender Ref.  No

Name of Work

Estimated Cost (Rs in Lakhs)

Earnest Money (Rs in Lakhs) Time Limit Cost of Blank Tender Form Class of Registration

1339/2103/---/10-11

Work of Providing and fixing of Continuous Digital Weather Data Display System at the main gate of Sinchan Bhavan, Jalna Road, Surangabad. 14.39 0.14 - Rs. 1000 Please contact Division office

1332/2103/1-12/10-11

Construction of Balance Earthwork and Structures on MR-3 of Wangargaon Branch of Dy. No 9 on N.M. canal. 23.31 0.24 12 Months Rs. 2000 Class V-A And Above

1331/2103/1-11/10-11

Construction of Balance Structures of Dy.No 9 and Wanjargaon Branch of Dy.No9 of N.M. canal. 48.60 0.49 12 Months Rs. 2000 Class V And Above

1330/2103/1-10/10-11

Construction of Balance Outlets on Dy. No 5, 6 & 8 of N.M. canal. 44.52 0.45 12 Months Rs. 2000 Class V And Above

1329/2103/1-9/10-11

Construction of Part-I works on N.M. Branch Canal No1 Dy. No 4, OL-1 to 5 of ML-2 21.18 0.22 12 Months Rs. 2000 Class V-A And Above

1328/2103/1-8/10-11

Construction of Part-I works on Direct outlets of Dy.No 13 MR-1, MR-2, MR-3 & ML-1 of Dy No 13 of N.M. Canal. 24.98 0.25 12 Months Rs. 2000 Class V-A And Above

1327/2103/1-7/10-11

Construction of Part-I works on DOL-1, ML-1 & its sub minors and OL-1, OL-2, & OR-1, OR-2 on ML-2 of Dy. No. 11 of N.M. Canal. 44.53 0.45 12 Months Rs. 2000 Class V And Above

1326/2103/1-6/10-11

Construction of Part-I works on DOL-8 to 13 & DOR-7 to 13 and ML-4 in RD 4110 to 6700 m of Dy.No 11 of N.M. Canal. 46.19 0.47 12 Months Rs. 2000 Class V And Above

1325/2103/1-5/10-11

Construction of Part-I works on DOR-1 to 5 ML-3 and DOR-4 to 10 in RD 3180 to 6100 m of Wanjargaon Branch of Dy. No.9. 42.89 0.43 12 Months Rs. 2000 Class V And Above

1324/2103/1-4/10-11

Construction of Part-I works on IML-2, ML-3, MR-1, MR-3 and Direct Otlets in RD 1420 to 2900 m of Sawkhedganga Branch of Dy.No9  of N.M. Canal. 46.81 0.47 12 Months Rs. 2000 Class V And Above

1323/2103/1-3/10-11

Construction of Part-I works on Ml-3 & DOR-1 to DOR-10 & DOL-1 To DOL-7 of Dy. No 4 of N.M. Branch Canal No1. 47.80 0.48 12 Months Rs. 2000 Class V And Above

1322/2103/1-2/10-11

Construction of Part-I works on Dy. No 23 & ML-1, DOR-1,2 DOR 5,7,8,,10 & DOR 13 of Dy. No 24 of N.M. Canal. 46.90 0.47 12 Months Rs. 2000 Class V And Above

1321/2103/1-1/10-11

Construction of Part-I works of DOL -3 to DOL-9 & DOR-2 to DOR-6 & OR-1 to OR-5, OL-1 to OL-3 of ML-3 (A) on Dy. No 1 of N.M. Branch Canal No1. 41.38 0.42 12 Months Rs. 2000 Class V And Above

1278/2103/10-4/09-10

Construction of Part-I works in RD 1380 M To 3800 M of of ML-2 @ RD 2040 M & SML-1 to SML-4 of Dy. No. 11 of N.M. Canal 47.98 0.48 12 Months Rs. 2000 Class V And Above

1277/2103/10-3/09-10

Construction of Part-I works from RD 2260 M To 4010 M and ML-3 0f Dy. No 11 of N.M. Canal 41.67 0.42 12 Months Rs. 2000 Class V And Above

1276/2103/10-2/09-10

Construction of Part-I work on mr-2 AND mr-3 @ RD 1880 M tO 3180 M of Wanjargaon Branch of Dy. No. 9 of N.M. Canal 40.85 0.41 12 Months Rs. 2000 Class V And Above

1275/2103/10-1/09-10

Construction of Part-I work on DOL-1 to 3 ML-2 and SMR-1 RD 980 to 1880 M of Wanjargaon Branch of Dy. No. 9 of N.M. Canal 32.80 0.33 12 Months Rs. 2000 Class V And Above

1229/2103/8-1/09-10

Repairing of Sub Division office, Irrigation Section Office, and Govt. Staff Quarter@ N.M. colony@ Gangapur Dist. Aurangabad. 23.48 0.24 8 Months Rs. 2000 Class V And Above

1160/2103/7-1/09-10

Construction of protection wall to Kaldhondi Aquaduct @ 33120 mtr. of N.M. canal. 23.73 0.24 12 Months Rs. 2000 Class V-A And Above

1160/2103/7-1/09-10

Construction of protection wall to Kaldhondi Aquaduct @ 33120 mtr. of N.M. canal. 23.73 0.24 12 Months Rs. 2000 Class V-A And Above

1081/2103/5-8/09-10

Construction of N.M. Canal Dy No.16 sub minor 1 & 2. 34.44 0.35 12 Months Rs. 2000 Class V And Above

1080/2103/5-7/09-10

Construction of Part-I work of N.M. Canal Dy No.5 MR-3, ML-4, 5500 mtr. to 7000 mtr. 44.39 0.45 12 Months Rs. 2000 Class V And Above

1079/2103/5-6/09-10

Construction of Part-I work of Dy No.4 Minor No1. 42.04 0.42 12 Months Rs. 2000 Class V-A And Above

1078/2103/5-5/09-10

Construction of Part-I work of Dy No.4 of N.M. Br.Canal No1. 23.00 0.23 12 Months Rs. 2000 Class V-A And Above

1077/2103/5-4/09-10

Construction of Part-I work of  Dy No.5, ML-5,6 Direct Outlet @ 7000 mtr. to 8500 mtr. 34.10 0.35 12 Months Rs. 2000 Class V And Above

1076/2103/5-3/09-10

Construction of Part-I work of N.M. Canal Dy No.8, Mr-I, (Kangoni Minor ) and SMR-1. 24.98 0.25 12 Months Rs. 2000 Class V And Above

1075/2103/5-2/09-10

Construction of Part-I work of N.M. Canal Dy No.5, ML-3, Direct Outlet @ 3500 mtr. to 5500 mtr. 37.81 0.38 12 Months Rs. 2000 Class V And Above

1074/2103/5-1/09-10

Construction of Part-I work of N.M. Canal Dy No.5 ML-1, MR-1, MR-2. 24.32 0.25 12 Months Rs. 2000 Class V And Above

1070/2103/4-5/09-10

Modified :
(Previous Ref : 1043/2103/4-5/09-10)
Construction of Direct outlet of Dy. No. 5, MR-5 & 8500 M to 12700 M of N.M. Canal.
34.44 0.35 12 Months Rs. 2000 Class V And Above

1069/2103/4-4/09-10

Modified :
(Previous Ref : 1042/2103/4-4/09-10)
Construction of Part-I of DOL 1 to 6 & Tail 1 R.I. and sub Minor No R-3 of Dy. No 20 of N.M. Canal.
44.39 0.45 12 Months Rs. 2000 Class V And Above

1068/2103/4-3/09-10

Modified :
(Previous Ref : 1041/2103/4-3/09-10)
Construction of Part-I work of Dy. No 19 Sub Minor No 1 OL-1 to 4 of N.M. Canal.
42.04 0.42 12 Months Rs. 2000 Class V And Above

1067/2103/4-2/09-10

Modified :
(Previous Ref : 1040/2103/4-1/09-10)
Construction of Part-I Direct outlet of Dy. No. 9 Sawkhedganga Br. Canal @ Ch 600 m. to 1420 m and MR-I ML1 of N.M. Canal.
23.00 0.23 12 Months Rs. 2000 Class V-A And Above

1066/2103/4-1/09-10

Modified :
(Previous Ref : 1039/2103/4-1/09-10)
Construction of Part-I Direwct outlet of Dy. No. 6 Sub minor No. ML-1, MR-1 of N.M. Canal.
34.10 0.35 12 Months Rs. 2000 Class V And Above

1065/2103/3-5/09-10

Construction of Part-I work of N.M. Branch Canal No 1 Dy No4 of N.M. Canal. 24.98 0.25 12 Months Rs. 2000 Class V And Above

1064/2103/3-4/09-10

Modified :
(Previous Ref : 1036/2103/3-4/09-10)
Construction of Part-I work of Ch.1660 m to 4000 m. Direct outlet of IML-1, ML-1A, and Wangargaon Br. Canal Ch. 180 M. ML-1 of  N.M. Canal.
37.81 0.38 12 Months Rs. 2000 Class V And Above

1063/2103/3-3/09-10

Modified :
(Previous Ref : 1035/2103/3-3/09-10)
Construction of Part-I work of of N.M. Branch Canal No1.
24.32 0.25 12 Months Rs. 2000 Class V And Above

1062/2103/3-2/09-10

Modified :
(Previous Ref : 1034/2103/3-2/09-10)
Construction of Part-I work Dy.No 9 @ Ch. 3280 M. MR-3 and Direct Outlet of Dy. No. 9 DOR 1 @  Ch. 2120  of N.M. Canal.
27.02 0.28 12 Months Rs. 2000 Class V And Above

1061/2103/3-1/09-10

Modified :
(Previous Ref : 1033/2103/3-1/09-10)
Construction of Part-I work Direct outlet of Dy. No. 8, Sub Minor No. ML2 of N.M. Canal.
42.31 0.43 12 Months Rs. 2000 Class V And Above

1043/2103/4-5/09-10

Construction of Direct outlet of Dy. No. 5, MR-5 & 8500 M to 12700 M of N.M. Canal. 34.44 0.35 12 Months Rs. 2000 Class V And Above

1042/2103/4-4/09-10

Construction of Part-I of DOL 1 to 6 & Tail 1 R.I. and sub Minor No R-3 of Dy. No 20 of N.M. Canal. 44.39 0.45 12 Months Rs. 2000 Class V And Above

1041/2103/4-3/09-10

Construction of Part-I work of Dy. No 19 Sub Minor No 1 OL-1 to 4 of N.M. Canal. 42.04 0.42 12 Months Rs. 2000 Class V And Above

1040/2103/4-2/09-10

Construction of Part-I Direct outlet of Dy. No. 9 Sawkhedganga Br. Canal @ Ch 600 m. to 1420 m and MR-I ML1 of N.M. Canal. 23.00 0.23 12 Months Rs. 2000 Class V-A And Above

1039/2103/4-1/09-10

Construction of Part-I Direwct outlet of Dy. No. 6 Sub minor No. ML-1, MR-1 of N.M. Canal. 34.10 0.35 12 Months Rs. 2000 Class V And Above

1037/2103/3-5/09-10

Construction of Part-I work of N.M. Branch Canal No 1 Dy No4 of N.M. Canal. 24.98 0.25 12 Months Rs. 2000 Class V And Above

1036/2103/3-4/09-10

Construction of Part-I work of Ch.1660 m to 4000 m. Direct outlet of IML-1, ML-1A, and Wangargaon Br. Canal Ch. 180 M. ML-1 of  N.M. Canal. 37.81 0.38 12 Months Rs. 2000 Class V And Above

1035/2103/3-3/09-10

Construction of Part-I work of of N.M. Branch Canal No1. 24.32 0.25 12 Months Rs. 2000 Class V And Above

1034/2103/3-2/09-10

Construction of Part-I work Dy.No 9 @ Ch. 3280 M. MR-3 and Direct Outlet of Dy. No. 9 DOR 1 @  Ch. 2120  of N.M. Canal. 27.02 0.28 12 Months Rs. 2000 Class V And Above

1033/2103/3-1/09-10

Construction of Part-I work Direct outlet of Dy. No. 8, Sub Minor No. ML2 of N.M. Canal. 42.31 0.43 12 Months Rs. 2000 Class V And Above

1006/2103/2-5/09-10

Construction of Part-I work of Dy. No 2 MR 2. 52.50 0.43 12 Months Rs. 2000 Class V-A And Above

1005/2103/2-4/09-10

Construction of Part-I work of NMC Canal Dy. No 8 Sub Minor 5 & 6 Direct Outlet and Ladgaon SubMinor ML-3. 46.98 0.47 12 Months Rs. 2000 Class V-A And Above

1004/2103/2-3/09-10

Construction of Part-I work of NMC Canal Dy.NO 3 & 3A. 45.90 0.46 12 Months Rs. 2000 Class V-A And Above

1003/2103/2-2/09-10

Construction of Part-I work of Dy. No 4 DOR 1,2,3 ML-1, MR-2 to MR-6. 49.50 0.50 12 Months Rs. 2000 Class V-A And Above

1002/2103/2-1/09-10

Construction of Part-I work of N.M.Canal Dy.No 25 Chack No 1 to 14. 24.86 0.25 12 Months Rs. 2000 Class V-A And Above

981/2103/6-9/09-10

Work of providing, fixing, Fabricating and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Shivna Road Bridge Site (A'bad Nagar Road) And providing abd fixing of Aquascan Continious digital Lake Water Data  Display System at Aurangabad Flood Control Room, Aurangabad. 34.29 0.34 6 Months Rs. 1500 Bombay Shop Act, 1948

980/2103/6-8/09-10

Work of providing, fixing and Fabricating and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Newasa - Shrirampur Road Bridge Site (Pravara River) And Sindphana Road Bridge site at Hirapur. 33.89 0.34 6 Months Rs. 1500 Bombay Shop Act, 1948

979/2103/6-7/09-10

Work of providing, fixing and Fabricating and Maintaining of Aquascan Contineous digital River Gauging Station on line Internet Connectivity Range 0-25 Meters at Dhora Road Bridge Site (A'bad Nagar Road) And Kopargaon Bridge Site (Godavari River). 33.89 0.34 6 Months Rs. 1500 Bombay Shop Act, 1948

978/2103/6-6/09-10

Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Raja takli Barrage And Upper Dudhna Dam And Aquascan Continious digital Raingauge with on line Internet Connectivity at Raja Takli Barragr, Ashti and Hirarpur. 42.26 0.46 6 Months Rs. 1500 Bombay Shop Act, 1948

977/2103/6-5/09-10

Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Mangrul Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Mangrul, Kumbhar Pimpalgaon and Tirthpuri. 31.16 0.37 6 Months Rs. 1500 Bombay Shop Act, 1948

976/2103/6-4/09-10

Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Jogla Devi Barrage And Patharwala Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Jogla Devi Barrage and Ambad. 37.16 0.37 6 Months Rs. 1500 Bombay Shop Act, 1948

975/2103/6-3/09-10

Work of providing, fixing and Maintaining of Aquascan Contineous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Apegaon Barrage And Shivna Takli Dam site And Aquascan Continious digital Raingauge with on line Internet Connectivity at Apegaon and Aurangabad. 37.16 0.37 6 Months Rs. 1500 Bombay Shop Act, 1948

974/2103/6-2/09-10

Work of providing, fixing and Maintaining of Aquascan Continuous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Hiradpuri Barrage And Nandurmadhmeshwar weir And Aquascan Continious digital Raingauge with on line Internet Connectivity at Nath Nagar (North) and Nath Nagar (South). 31.16 0.37 6 Months Rs. 1500 Bombay Shop Act, 1948

973/2103/6-1/09-10

Work of providing, fixing and Maintaining of Aquascan Continuous digital Water Level Gauge with on line Internet Connectivity Range 0-25 Meters at Shahagad Barrage And Aquascan Continious digital Raingauge with on line Internet Connectivity at Shahagad Barrage, Vihamandwa and Wadigodri. 36.77 0.37 6 Months Rs. 1500 Bombay Shop Act, 1948

867/2103/2-4/08-09

Construction of part -I work on MR-2 of Dy. No 1 of Nandur Madhmeshwar Canal. 42.75 0.43 15 Months Rs. 2000 Class-V and Above

866/2103/2-3/08-09

Construction of part -I work on ML-1, MR-1, ML-2, MR-3 of Dy. No 1 of Nandur Madhmeshwar Canal. 47.62 0.48 15 Months Rs. 2000 Class-V and Above

865/2103/2-2/08-09

Construction of part -I work on Direct outlet No1 to 14 to 31 of Dy. No 1 of Nandur Madhmeshwar Canal. 48.08 0.49 15 Months Rs. 2000 Class-V and Above

864/2103/2-1/08-09

Construction of part -I work on Direct outlet No1 to 13 of Dy. No 1 of Nandur Madhmeshwar Canal. 48.03 0.49 15 Months Rs. 2000 Class-V and Above

858/2103/1-1/08-09

Construction of catch water Drain @Ch 1540 to 1810 Mtr @ Construction of Protection wall @ km 2 & 3 of Nandur Madhmeshwar Canal. 48.00 0.48 14  Months Rs. 2000 Class-V and Above

685/2103/11-2/07-08

Re-Re-Re-Modified:
(Previous No 658/2103/ 11-2 07-08)
Construction of  balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

684/2103/11-1/07-08

Re-Re-Re-Modified:
(Previous No 658/2103/ 11-1 07-08)
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

658/2103/11-2/07-08

Re-Re-Modified:
Construction of  balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

657/2103/11-1/07-08

Re-Re-Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

665/2103/11-2/07-08

Re-Modified:
Construction of  balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

664/2103/11-1/07-08

Re-Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

663/2103/10-2/07-08

Re-Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

662/2103/10-1/07-08

Re-Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

661/2103/9-2/07-08

Re-Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

660/2103/9-1/07-08

Re-Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

659/2103/8-2/07-08

Re-Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

658/2103/8-1/07-08

Re-Modified:
Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

637/2103/11-2/07-08

Modified:
Construction of  balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

636/2103/11-1/07-08

Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. 
43.80 0.44 10  Months Rs. 2000 Class-V and Above

635/2103/10-2/07-08

Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16. 
46.00 0.46 10  Months Rs. 2000 Class-V and Above

634/2103/10-1/07-08

Modified:
Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14. 
44.00 0.44 10  Months Rs. 2000 Class-V and Above

633/2103/9-2/07-08

Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17. 
48.00 0.48 10  Months Rs. 2000 Class-V and Above

632/2103/9-1/07-08

Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25. 
43.00 0.43 10  Months Rs. 2000 Class-V and Above

631/2103/8-2/07-08

Modified:
Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21. 
43.00 0.43 10  Months Rs. 2000 Class-V and Above

630/2103/8-1/07-08

Modified:
Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2. 
46.50 0.47 10  Months Rs. 2000 Class-V and Above

622/2103/11-2/07-08

Construction of  balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4.  44.00 0.44 10  Months Rs. 2000 Class-V and Above

621/2103/11-1/07-08

Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11.  43.80 0.44 10  Months Rs. 2000 Class-V and Above

620/2103/10-2/07-08

Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 15 to 16.  46.00 0.46 10  Months Rs. 2000 Class-V and Above

619/2103/10-1/07-08

Construction of  selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 13 to 14.  44.00 0.44 10  Months Rs. 2000 Class-V and Above

618/2103/9-2/07-08

Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 13 to 17.  48.00 0.48 10  Months Rs. 2000 Class-V and Above

617/2103/9-1/07-08

Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 23,23A, 23B, 24 and 25.  43.00 0.43 10  Months Rs. 2000 Class-V and Above

616/2103/8-2/07-08

Construction of Balance earthwork and structures and selective Lining of Nandur Madhmeshwar Canal Dy. No 19 to 21.  43.00 0.43 10  Months Rs. 2000 Class-V and Above

615/2103/8-1/07-08

Construction of Balance earthwork and structures of Dy.no 3 to 5 Tail Minor of Nandur Madhmeshwar Branch Canal No 2.  46.50 0.47 10  Months Rs. 2000 Class-V and Above

614/2103/7-1/07-08

Construction of earthwork and structures on Tailong of Dy. o.1 Minor and Sub Minors of Nandur Madhmeshwar Branch Canal No.2.  45.2 0.46 10  Months Rs. 2000 Class-V and Above

587/2103/6-1/07-08

Earthwork and structures of N.M.Canal Dy.No.5 ML-1 (A) of Tail minor and Earthwork and structure of Distributory No5 ML1. 19.57 0.02 3  Months Rs. 1000 Class-V and Above

583/2103/5-2/07-08

Construction of balance earthwork and structures and Earthwork in km 11 and 13 on Distributory No.1 of Branch Canal No 1 on Nandur Madhmeshwar Canal. 56.94 0.57 3  Months Rs. 2000 Class-IV-(A) and Above

582/2103/5-1/07-08

Construction of balance earthwork and structures and Earthwork in km 9 and 10 on Distributory No.1 of Branch Canal No 1 on Nandur Madhmeshwar Canal. 58.22 0.59 3  Months Rs. 2000 Class-IV-(A) and Above

581/2103/4-1/07-08

Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./ML-3. 82.59 0.83 3  Months Rs. 2000 Class-IV-(A) and Above

580/2103/3-2/07-08

Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./MR-3 and ML-4. 62.90 0.70 3  Months Rs. 2000 Class-IV-(A) and Above

579/2103/3-1/07-08

Construction of balance earthwork and structures on Nandur Madhmeshwar Canal Dy-5./ML-6,7,8. 62.17 0.63 3  Months Rs. 2000 Class-IV-(A) and Above

578/2103/2-2/07-08

Construction of balance structures and selective lining from km 9 to 13 on Nandur Madhmeshwar Canal Dy-5. 56.96 0.57 3  Months Rs. 2000 Class-IV-(A) and Above

577/2103/2-1/07-08

Construction of balance structures and selective lining from km 1 and 8 on Nandur Madhmeshwar Canal Dy-5. 58.98 0.59 3  Months Rs. 2000 Class-IV-(A) and Above

578/2103/2-2/07-08

Construction of balance structures and selective lining from km 9 to 13 on Nandur Madhmeshwar Canal Dy-5. 56.96 0.57 3  Months Rs. 2000 Class-IV-(A) and Above

577/2103/2-1/07-08

Construction of balance structures and selective lining from km 1 and 8 on Nandur Madhmeshwar Canal Dy-5. 58.98 0.59 3  Months Rs. 2000 Class-IV-(A) and Above

574/2103/1-1/07-08

Construction of Earthwork and structure on MR-2 and ML-3 (A) on Distributory No1 on Branch Canal No 1 of Nandur Madhmeshwar Canal. 44.83 0.45 3  Months Rs. 2000 Class-V and Above

96/2103/4-2/ 05-06

Extension and strengthening of Structure of N.M.Branch Canal No.2 37.00 0.49 12  Months Rs. 3000 Class-V and Above

95/2103/4-1/ 05-06

Extension and strengthening of Structure of N.M.Branch Canal No.1 49.00 0.37 12  Months Rs. 3000 Class-V and Above

94/2103/3-5/ 05-06

Extension and strengthening of Structure in Km. 110 To 127 of N.M.Canal 82.00 0.82 12  Months Rs. 3000 Class-IV(A) and Above

93/2103/3-4/ 05-06

Extension and strengthening of Structure in Km. 91 To 110 of N.M.Canal 121.00 1.21 24  Months Rs. 4000 Class-IV and Above

92/2103/3-3/ 05-06

Extension and strengthening of Structure in Km. 6 To 90 of N.M.Canal 131.00 1.31 24  Months Rs. 4000 Class-IV and Above

91/2103/3-2/ 05-06

Extension and strengthening of Structure in Km. 31 To 60 of N.M.Canal 128.00 1.28 24  Months Rs. 4000 Class-IV and Above

90/2103/3-1/ 05-06

Extension and strengthening of Structure in Km. 1 To 30 of N.M.Canal 132.00 1.32 24  Months Rs. 4000 Class-IV and Above

89/2103/2-3/ 05-06

Construction of balance C.C. Lining in Km. 81To 127 and Branch Canal No.1, km. 4 to 16 of N.M.Canal by mechanised system 5356.00 53.56 36  Months Rs. 10000 Class I A

88/2103/2-2/ 05-06

Construction of balance C.C. Lining in Km. 51To 80 of N.M.Canal by mechanised system 2894.00 28.94 36  Months Rs. 5000 Class I A

87/2103/2-1/ 05-06

Construction of balance C.C. Lining in Km. 0 To 50 of N.M.Canal by mechanised system 3220.00 32.20 36  Months Rs. 5000 Class I A