Tender
Ref. |
Name of Work |
Last Date for Purchase of Bid
Capacity / P.Q. Document |
Issue
Date |
Submit Date |
For Details, |
795/3303/2-1/08-09 |
Construction of High Level Barrage at Roshanpuri, Tq. Majalgaon, Dist Beed. | Upto 11-11-08 |
Upto 24-11-08 |
Upto 29-11-08 |
MCD 7, Gangakhed |
794/2105/5-1/08-09 |
Construction of Manepuri- Dudhna- Kalegaon Road in lieu of length coming under submergence of Mnepuri Storage Tank, Tq. Ghansawangi, Dist. Jalna. | Upto 01-12-2008 |
Upto 26-12-08 |
Upto 31-12-08 |
JMID, Jalna |
793/2105/3-1/08-09 |
Construction of Hatwan L.M.I. Project , Earthwork, Waste weir, Sluice and other attached work, Tqand Dist. Jalna. | Upto 01-12-2008 |
Upto 26-12-08 |
Upto 31-12-08 |
JMID, Jalna |
792/3303/2-3/08-09 |
Construction of earthwork, lining and structures of distributories and minors in km 46 to 55 of Lower Dudhna Left Bank Canal, Dist. Parbhani. | Upto 20-11-08 |
Upto 05-12-08 |
Upto 12-12-08 |
MCD 10, Parbhani |
791/3303/2-2/08-09 |
Construction of earthwork, lining and structures of distributories and minors in km 46 to 55 of Lower Dudhna Left Bank Canal, Dist. Parbhani. | Upto 20-11-08 |
Upto 05-12-08 |
Upto 12-12-08 |
MCD 10, Parbhani |
790/3303/2-1/08-09 |
Construction of earthwork, lining and structures of distributories and minors in km 38 to 45 of Lower Dudhna Left Bank Canal, Dist. Parbhani. | Upto 20-11-08 |
Upto 05-12-08 |
Upto 12-12-08 |
MCD 10, Parbhani |
789/2101/4-1/08-09 |
Corrigendum : (Earlier TRN784/2101/4-1/08-09) Preparing a Master Plan for Integrated Development and Management of Water Resources of Dudhna Sub-basins and River covering a total geographical area 5170 Sq. Km.. |
--- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
788/2101/3-1/08-09 |
Corrigendum : (Earlier TRN783/2101/3-1/08-09) Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna Sub-basins and River covering a total geographical area of 12082 Sq. Km.. |
--- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
787/2101/2-1/08-09 |
Corrigendum : (Earlier TRN782/2101/2-1/08-09) Preparing Master Plan for Integrated Development and Management of Water Resources of Pus and Arunawati Sub-basins and River covering a total geographical area of about 6,316 Sq. Km.. |
--- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
786/4110/4-2/08-09 |
B) Construction of tunnels & respective allied works for Manjarpada diversion scheme, Tal. Surgana, Dist. Nashik. | Upto 03-11-08 |
Upto 21-11-08 |
Upto 26-11-08 |
MID, Nashik |
785/4110/4-1/08-09 |
A) Construction of Earthen Dam, spillway & respective allied works including forest clearence for Manjarpada diversion scheme, Tal. Surgana, Dist. Nashik. | Upto 03-11-08 |
Upto 21-11-08 |
Upto 26-11-08 |
MID, Nashik |
784/5001/1-1/08-09 |
Supply of cement for the year 2008-09 | --- | Upto 09-11-2008 |
Upto 4-11-2008 At CE&CA, CAD, Aurangabad office |
Chief Engineer (WR),WRD, Aurangabad |
783/2101/4-1/08-09 |
Preparing a Master Plan for Integrated Development and Management of Water Resources of Dudhna Sub-basins and River covering a total geographical area 5170 Sq. Km.. | --- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
782/2101/3-1/08-09 |
Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna Sub-basins and River covering a total geographical area of 12082 Sq. Km.. | --- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
781/2101/2-1/08-09 |
Preparing Master Plan for Integrated Development and Management of Water Resources of Pus and Arunawati Sub-basins and River covering a total geographical area of about 6,316 Sq. Km.. | --- | Upto 31-10-2008 |
Upto 4-11-2008 At CE (WRD), Aurangabad office |
MID, Aurangabad |
780/2304/1-2/08-09 |
Construction of earthen dam waste weir Tail channel and its appurtenant works DongarbKonali Storage Tank Tq Jalkot, Dist. Latur. | Upto 21-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMPD, Latur |
779/2304/1-1/08-09 |
Construction of earthen dam waste weir Tail channel and its appurtenant works Chandegaon Storage Tank Tq Udgir, Dist. Latur. | Upto 21-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMPD, Latur |
778/3405/2-7/08-09 |
Constg of Balance earthwork in km 49 of Isapur Right Bank Canal. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
777/3405/2-6/08-09 |
Constg of Balance earthwork in km 48 of Isapur Right Bank Canal. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
776/3405/2-5/08-09 |
Constg of Lining work on RM6, Constg of Lining work of Talegaon Distributory and constg of Lining works on Tail Distributory of Jamgaon Branch Canal. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
775/3405/2-4/08-09 |
Constg of Balance earthwork and lining work of Wadgaon - Readgaon Distributory and constg of Balance earthwork and Lining works of Solapur Distributory of BBC. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
774/3405/2-3/08-09 |
Constg of Earthwork and Lining in Km 1 to 7 of Hangarga Distributory and constg of Lining work on Manur Distributory of SRBC. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
773/3405/2-2/08-09 |
Constructing of Balance earthwork and lining on Tail Distributory and constg of Balance earthwork and lining works of Bhogaon Distributory. | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
772/3405/2-1/08-09 |
Construction of Lining work in km 21 to 31 of Bhategaon Branch Canal | Upto 10-10-2008 |
Upto 24-10-2008 |
Upto 31-10-2008 |
UPPD6, Nanded |
771/2301/5-1/08-09 |
Construction of Drop Wall in Tail Channel at Ch 210 m at Wangaon S.T. Tq. & Dist. Beed | N.A. | Upto 06-11-08 |
Upto 12-11-08 |
BID, Beed |
770/2305/3-1/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Vairagad Storage Tank, Tq Ahmedpur, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
769/2305/2-6/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Bamajichiwadi Storage Tank, Tq Udgir, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
768/2305/2-5/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Molwan Storage Tank, Tq Ahmedpur, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
767/2305/2-4/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Sayyadpur Storage Tank, Tq Renapur, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
766/2305/2-3/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Waghdari Storage Tank, Tq Deoni, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
765/2305/2-2/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Bhada Storage Tank, Tq Deoni, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
764/2305/2-1/08-09 |
Construction of Earthen Dam, Waste weir and its appurtenent works of Chondi Storage Tank, Tq Udgir, Dist. Latur. | Upto 20-10-2008 |
Upto 14-11-2008 |
Upto 21-11-2008 |
LMID, Latur |
763/2301/4-1/08-09 |
Strengthening work of Left side wall of Dipegon K.T.Weir Tq. Majalgaon, Dist. Beed | --- | Upto 06-10-08 |
Upto 13-10-08 |
BID, Beed |
762/3404/11-13/08-09 |
Const. of Cross Regulator cum escape channels at RD. 23805 M, 48920 M, 81060 M & 89440 M. of K.B.C. | --- | Upto 10-10-2008 |
Upto 15-10-2008 |
UPPD5, Hadgaon |
761/3404/11-12/08-09 |
Const. of Balance Earth work & lining of Km. 1 to 5 of Minor No. 104 & M.112 of K.B.C. & Const. of HPC at RD. 63645 M. of K.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
760/3404/11-11/08-09 |
Const.of balance Earth work & lining in Km. 1 to 4 of Ravangaon Disty., Const. of Earth work & structures of Sub-Minor No. 49 , Tail channesl & tail escape of M. 37 to M.79, Const. of 11 Dhobi ghat & cross wall at RD. 52540 M. of K.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
759/3404/11-10/08-09 |
Const. of Balance Earth work & lining in Km. 81 to 85 & 86 to 90 of KBC.& Const. of Earth work & structures of Tail Minor of K.B.C. and Const. of VRB. at RD. 82960 M, 83980 M. 86920 M., 99200 M. & 89960 M. of KBC. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
758/3404/11-9/08-09 |
Const. of balance Earth work & lining in RD. No. 71800 M. to Km. 80 of K.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
757/3404/11-8/08-09 |
Const. of balance Earth work & lining in Km. 48 to 71400 M. of K.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
756/3404/11-7/08-09 |
Const. of balance Earth work & lining in Km. 0 to 48 of K.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
755/3404/11-6/08-09 |
Cont.of Balance Earth work & lining on Brahamangaon Disty. at RD. 69400 M. & Dhanki Disty. at RD. 79740 M. & Sawaleshwar Disty. at RD. 83400 M. on I.L.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
754/3404/11-5/08-09 |
Const. of Balance Earth work & lining of Dighadi Disty. at RD. 4580 m. & Bori Disty.at RD. 11350 M. of Chalgani Branch Canal on ILBC. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
753/3404/11-4/08-09 |
Const.of Balance Earth work & lining of Devsari Disty. at RD. 3720 M. of Chalgani Branch canal on I.L.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
752/3404/11-3/08-09 |
Const. of Balance Earth work & lining of Minor No. 20 at RD. 27780 M.,Minor No. 36 at RD. 45785 M. & Limbgavan Minor at RD. 52540 M. of I.L.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
751/3404/11-2/08-09 |
Construction of Balance Earth work & lining in Km. 1 to 11.35 of Chalgani Branch Canal. at RD. 67730 M. of I.L.B.C. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
750/3404/11-1/08-09 |
Costruction of Balance Earth work & Lining in Km. 54 to 84 of Isapur Left Bank Canal. | Upto 3-10-2008 |
Upto 19-10-2008 |
Upto 24-10-2008 |
UPPD5, Hadgaon |
749/3405/1-3/08-09 |
Construction of Balance earthwork and Lining and structures in km 1 to 10 of Nimtake Dystributory on Chinchala Branch Canal. | Upto 26-09-2008 |
Upto 10-10-2008 |
Upto 18-10-2008 |
UPPD6, Nanded |
748/3405/1-2/08-09 |
Construction of Balance earthwork and Lining and structures in km 132 to 140 of Isapur Right Bank Canal. | Upto 26-09-2008 |
Upto 10-10-2008 |
Upto 18-10-2008 |
UPPD6, Nanded |
747/3405/1-1/08-09 |
Construction of Balance earthwork and Lining and structures in km 125 to 131 of Isapur Right Bank Canal. | Upto 26-09-2008 |
Upto 10-10-2008 |
Upto 18-10-2008 |
UPPD6, Nanded |
746/3303/1-6/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 11 to 25 of Lower Dudhna , Right Bank Canal Dist.Parbhani | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
745/3303/1-5/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 1 to 10 of Lower Dudhna , Right Bank Canal Dist.Parbhani | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
744/3303/1-4/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 33 to 37 of Lower Dudhna , Left Bank Canal Dist.Parbhani | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
743/3303/1-3/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 28 to 32 of Lower Dudhna , Left Bank Canal Dist.Parbhani. | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
742/3303/1-2/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 16 to 27 of Lower Dudhna Left Bank Canal , Dist.Parbhani | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
741/3303/1-1/08-09 |
Construction of Earth work, lining and structures of distributaries and minors in km. 1 to 15 of of Lower Dudhna Left Bank Canal, Dist.Parbhani. | Upto 22-09-08 |
Upto 06-10-08 |
Upto 13-10-08 |
MCD 10, Parbhani |
740/2101/21-1/08-09 |
Shivana Takali Medium Project Tq. Kannad - construction of cart Track Bridge on Nirgudi Nalla at Tapargaon. | --- | Upto 29-09-08 |
Upto 04-10-08 |
MID, Aurangabad |
739/4109/1-1/08-09 |
Construction of Diversion Road for Tranbak Ghoti Bhandardara Road S.H. No 21 from Ch 52/200 to 57/000 (Under Submergence of Waki Dam) | Upto 08-09-2008 |
Upto 26-09-2008 |
Upto 01-10-2008 |
NMPD, Nashik |
738/3404/8-2/08-09 |
Construction of Bed and side lining in km 1 to 11.35 of L.B.C. at RD 67730 M of Isapur Left Bank Canal. | Upto 25-08-2008 |
Upto 10-09-2008 |
Upto 15-09-2008 |
UPPD5, Hadgaon |
737/3404/8-1/08-09 |
Construction of Balance earthwork and Lining in km 54 to 84 of Isapur Left Bank Canal. | Upto 25-08-2008 |
Upto 10-09-2008 |
Upto 15-09-2008 |
UPPD5, Hadgaon |
736/3306/3-8/08-09 |
Additional Lt Line for rehabilitation work of electrification at Salegaon, Tq. Partur, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
735/3306/3-7/08-09 |
Providing electrical Supply for Public Water Supply at Mapegaon, Tq. Mantha, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
734/3306/3-6/08-09 |
Providing electrical Supply for Public Water Supply at Wanjoal, Tq. Mantha, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
733/3306/3-5/08-09 |
Additional HT & LT Line for rehabilitation work of electrification at Chincholi, Tq. Partur, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
732/3306/3-4/08-09 |
Additional Lt Line for rehabilitation work of electrification at Chincholi, Tq. Partur, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
731/3306/3-3/08-09 |
Additional Lt Line for rehabilitation work of electrification at Deola Tq. Partur, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
730/3306/3-2/08-09 |
Additional Lt Line for rehabilitation work of electrification at Rewalgaon, Tq. Partur, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
729/3306/3-1/08-09 |
Additional Lt Line for rehabilitation work of electrification at Kedar Wakadi, Tq. Mantha, Dist Jalna. | --- | Upto 25-08-2008 |
Upto 29-08-2008 |
Lower Dudhna P. Div. Selu |
728/2301/3-1/08-09 |
Construction of Tunnel from RD 2980 to 4200 m on Left Bank Cnal of Upper Kundlika Medium Project, Tq. Wadwani, Dist. Beed. | Upto 25-08-2008 |
Upto 12-09-08 |
Upto 18-09-08 |
BID, Beed |
727/2101/20-1/08-09 |
Construction of Open Gutter in rehabilitated village at Jaitapur of Shivna Takli Medium Project, Tq, Kannad, Dist, Aurangabad | --- | Upto 04-09-08 |
Upto 09-09-08 |
MID, Aurangabad |
726/2105/4-1/08-09 |
Construction of Railgaonwadi storage Tank, Tq. Bhokardhan, Dist Jalna. | Upto 27-08-2008 |
Upto 26-09-08 |
Upto 03-10-08 |
JMID, Jalna |
| 725/2407/1-2/08-09 | Taking trial bores for Nira Bhima in link tunnel of link No 5 under Krishna Bhima stabilisation project Km 13 to 25. | --- | Upto 01-09-2008 |
Upto 08-09-2008 |
ISID, Osmanabad |
| 724/2407/1-1/08-09 | Taking trial bores for Nira Bhima in link tunnel of link No 5 under Krishna Bhima stabilisation project Km 0 to 12. | --- | Upto 01-09-2008 |
Upto 08-09-2008 |
ISID, Osmanabad |
723/2101/8-1/08-09 |
Revised: Previous No691/2101/8-1/09-09 Construction of earthwork and structures of Tail Dystributory on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad. |
--- | Upto 18-08-2008 |
Upto 25-08-2008 |
MID, Aurangabad |
722/2304/1-1/08-09 |
Construction of Hosur K.T. Weir Tq. Nilanga, Dist Latur | Upto 18-08-2008 |
Upto 02-09-2008 |
Upto 08-09-2008 |
LMPD, Latur |
721/2101/14-1/08-09 |
Construction of high level submergence box cell bridge a/c khokari river (Deogaon @ LMI project) & a/c Lendi nalla, Tq, Kannad, Dist Aurangabad | Upto 18-08-2008 |
Upto 15-09-2008 |
Upto 20-09-2008 |
MID, Aurangabad |
720/2101/18-1/08-09 |
Constructional Anti-Termite for C.E. office & premises @sinchan Bhavan premises Aurangabad & Residential quarter@ Bhagirathnagar, Aurangabad | --- | Upto 25-08-2008 |
Upto 30-08-2008 |
MID, Aurangabad |
719/2101/--2/08-09 |
Appointing a Security guard at Bhagirithnagar / Tembhapuri godown. | --- | Upto 16-08-2008 |
Upto 30-08-2008 |
MID, Aurangabad |
718/2101/--1/08-09 |
Modifications with furniture in the mini guest house at Haji Ali guest House, Mumbai | --- | Upto 16-08-2008 |
Upto 30-08-2008 |
MID, Aurangabad |
717/2101/13-1/08-09 |
Revised: (Earlier TRN713/2101/13-1/08-09) Drainage work @ downstream of Earthen Dam Ch 3820 m to 3890 m of Shivna Takli Medium Project, Tq Kannad. |
--- | Upto 16-08-2008 |
Upto 21-08-2008 |
MID, Aurangabad |
716/2307/2-2/08-09 |
Construcrtion of C.C. Lining with required earthwork of Bodka Dystributory @ RD 39270 M on Manjra Right Bank Canal & Arajkheda Distributory @ RD 71740 M on Manjra Left Bank Canal. | Upto 22-07-2008 |
Upto 05-08-08 |
Upto 11-06-08 |
LTCDn2, Latur |
715/2307/2-1/08-09 |
Construcrtion of C.C. Lining with required earthwork of Isthal Dy. @ RD 7180, Wangdari Dy @ RD 38900, Pohregaon Dy. @ RD 63200 and Sangvi Distributory @RD 71540 M on Manjra Left Bank Canal.s | Upto 22-07-2008 |
Upto 05-08-08 |
Upto 11-06-08 |
LTCDn2, Latur |
714/2101/17-1/08-09 |
Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects mapa under G.M.I.D.C. | --- | Upto 20-08-2008 |
26-08-2008 | MID, Aurangabad |
713/2101/13-1/08-09 |
Drainage work @ downstream of Earthen Dam Ch 3820 m to 3890 m of Shivna Takli Medium Project, Tq Kannad. | --- | Upto 29-07-2008 |
Upto 04-08-2008 |
MID, Aurangabad |
712/2101/16-1/08-09 |
Construction of Approach road and diversion road for Dhapagalwad Storage Tank , Tq Soyegaon, Dist Aurangabad. | --- | Upto 05-08-2008 |
Upto 11-08-2008 |
MID, Aurangabad |
711/2101/15-1/08-09 |
Providing and supplying of Printed Dist map of eight district of Marathwada region showing the position of Major, Medium, Minor KT Weir, Lift irrigation schemes and barrages as on 30-06-08 in size 90X 60 CM on 100 Gcm Art paper with colour etc as per sample map given (1600 nos) and Aurangabad Dist map seze 45 x 29 cm (200 nos) | --- | Upto 05-08-2008 |
Upto 11-08-2008 |
MID, Aurangabad |
710/2101/12-1/08-09 |
Wakod Medium project Tq Phulambri Dist Aurangabad - Construction of C.R. Escapes on the Main Canal & V Notches on Toe Drain of Wakod Main Dam & D.O. 4 on Main Canal. | --- | Upto 05-08-2008 |
Upto 11-08-2008 |
MID, Aurangabad |
709/2101/7-1/08-09 |
Revised: (Previous No. 692/2101/7-1/ 08-09) Maintenance and cleaning premises of Bhagirathnagar colony and AIC premises. |
--- | Upto 02-07-2008 |
Upto 07-07-2008 |
MID, Aurangabad |
708/2101/9-1/08-09 |
Revised: (Previous No. 688/2101/9-1/ 08-09) Tembhapuri Medium Project - Constructing of Earthwork and structure of approach road to Agriculture Land and Constructing CD works and strengthening of Internal Road of Rehabilitated village Shivarai, Tq. Gangapur, Dist. Aurangabad. |
--- | Upto 02-07-2008 |
Upto 08-07-2008 |
MID, Aurangabad |
707/2301/2-1/08-09 |
Construction of Earthwork, Road Bridges, Nalla Bridges, outlets etc. in km. 1 to 3 & 5 of L.B.C. of Upper Kundlika Medium Project Tq. Wadwani, Dist. Beed. | Upto 09-07-2008 |
Upto 22-07-08 |
Upto 28-07-08 |
BID, Beed |
706/2101/2-1/08-09 |
Corrigendum: (Previous No. 690/2101/2-1/ 08-09) Preparing a Master Plan for Integrated Development and Management of Water Resources of Pus and Arunawati Sub-basins. This includes area of sub basins of Pus and Arunawati Rivers covering a total geographical area of about 6,316 Sq. Km.. |
--- | Upto 23-05-2008 |
Upto 21-06-2008 |
MID, Aurangabad |
705/2101/1-1/08-09 |
Corrigendum: (Previous No. 689/2101/1-1/ 08-09) Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna & Dudhna Sub-basins. This includes area of sub basins of Purna & Dudhna Rivers covering a total geographical area of 17252 sq. km. |
--- | Upto 23-05-2008 |
Upto 21-06-2008 |
MID, Aurangabad |
704/2101/11-1/08-09 |
Sillegaon L.M.I. Project, Tq. Gangapur Dist Aurangabad. Balance work of drain (Earthwork & Revetment) | --- | Upto 03-07-2008 |
Upto 08-07-2008 |
MID, Aurangabad |
703/2101/10-1/08-09 |
Survey, Planning and design of Distribution and Drainage network of command area under Tambhaouri Medium Project (Dy. 1,2,3,4,5,6,& 8 of Main Canal & Dy. No. 1,2,3 & 4 of berm canal. | --- | Upto 03-07-2008 |
Upto 08-07-2008 |
MID, Aurangabad |
702/2201/1-3/08-09 |
Providing civic amneties in newly rehabilitated village @ Bhingoli, Tq. Mukhed, Dist. Nanded | --- | Upto 9-06-08 |
Upto 13-06-08 |
Lendi PD, Nanded |
701/2201/1-2/08-09 |
Providing civic amneties in newly rehabilitated village @ Bhendegaon (Bk), Tq. Mukhed, Dist. Nanded | --- | Upto 9-06-08 |
Upto 13-06-08 |
Lendi PD, Nanded |
700/2201/1-1/08-09 |
Providing civic amneties in newly rehabilitated village @ Hasnal, Tq. Mukhed, Dist. Nanded | --- | Upto 9-06-08 |
Upto 13-06-08 |
Lendi PD, Nanded |
699/2201/1-2/08-09 |
Providing civic amneties in newly rehabilitated village @ Biharipur Tq. Mukhed, Dist. Nanded | --- | Upto 19-06-08 |
Upto 23-06-08 |
Lendi PD, Nanded |
698/2201/1-1/08-09 |
Providing civic amneties in newly rehabilitated village @ Marajwadi Tq. Mukhed, Dist. Nanded | --- | Upto 19-06-08 |
Upto 23-06-08 |
Lendi PD, Nanded |
697/2101/5-1/08-09 |
Revised: (Previous No. 655/2101/5-1/ 07-08) Construction of approach road Jaitapur Rehabilitated Gaothan to field (for farmers) of Shivnatakali Project, Tq. Kannad, Dist. Aurangabad. |
-- | Revised: Upto 01-07-2008 |
Revised: Upto 08-07-2008 |
MID, Aurangabad |
696/4110/3-1/08-09 |
Constructing L-Earthwork & C.D. Wpork in Km. 1 to 4 of Anjaneri R.B. Canal. | --- | Upto 18-06-08 |
Upto 23-06-08 |
MID, Nashik |
695/4110/2-1/08-09 |
Constructing girder launching work on spillway bridge of Gul. Project, Tal Chopada, Dist. Jalgaon. | --- | Upto 03-06-08 |
Upto 09-06-08 |
MID, Nashik |
694/2101/4-1/08-09 |
Revised: (Previous No. 562/2101/32-1/ 07-08) Construction of earthwork and structures of Dy. N01 of Main Canal Deogaon (R) L.M.I.Project, Tq. Gangapur, Dist Aurangabad. |
--- | Upto 02-06-2008 |
Upto 06-06-2008 |
MID, Aurangabad |
693/2101/32-1/07-08 |
Revised: (Previous No 562/2101/32-1/ 07-08) Providing and colour printing of computerised Index Map of Godavari Marathwada Irrigation Development Corporation, Aurangabad, District maps under G.M.I.D.C. and all projects maps under G.M.I.D.C. |
--- | Upto 12-06-2008 |
Upto 19-06-2008 |
MID, Aurangabad |
692/2101/7-1/08-09 |
maintenance and cleaning premises of Bhagirathnagar colony and AIC premises. | --- | Upto 04-06-2008 |
Upto 09-06-2008 |
MID, Aurangabad |
691/2101/8-1/08-09 |
Construction of earthwork and structures of Tail Dystributory on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad. | --- | Upto 16-06-2008 |
Upto 23-06-2008 |
MID, Aurangabad |
690/2101/2-1/08-09 |
Preparing a Master Plan for Integrated Development and Management of Water Resources of Pus and Arunawati Sub-basins. This includes area of sub basins of Pus and Arunawati Rivers covering a total geographical area of about 6,316 Sq. Km.. | --- | Upto 23-05-2008 |
Upto 21-06-2008 |
MID, Aurangabad |
689/2101/1-1/08-09 |
Preparing a Master Plan for Integrated Development and Management of Water Resources of Purna & Dudhna Sub-basins. This includes area of sub basins of Purna & Dudhna Rivers covering a total geographical area of 17252 sq. km. | --- | Upto 23-05-2008 |
Upto 21-06-2008 |
MID, Aurangabad |
688/2101/9-1/08-09 |
Tembhapuri Medium Project - Constructing of Earthwork and structure of approach road to Agriculture Land and Constructing CD works and strengthening of Internal Road of Rehabilitated village Shivarai, Tq. Gangapur, Dist. Aurangabad. | --- | Upto 13-06-2008 |
Upto 18-06-2008 |
MID, Aurangabad |
| 687/2204/2-1/08-09 | Construction of New Diversion Bridge accross the Lohegaon to Himparga / Kinahala @ RD 140 m of Talni L.M.I. Tank submergence, Tq. Biloli, Dist. Nanded. | --- | Upto 09-06-2008 |
Upto 12-06-2008 |
MPD, Nanded |
686/2307/1-1/08-09 |
Construction of Killari (Kawtha) K.T. Weir, Tq. Ausa, Dist. Latur. | Upto 26-05-2008 |
Upto 09-06-08 |
Upto 16-06-08 |
LTCDn2, Latur |
685/2103/11-2/07-08 |
Re-Re-Re-Modified: (Previous No 658/2103/ 11-2 07-08) Construction of balance work and selective Lining of Nandur Madhmeshwar Canal Dy. No 3, 3-A and 4. |
--- | Upto 16-05-2008 |
Upto 22-05-2008 |
NMCD, Vaijapur |
684/2103/11-1/07-08 |
Re-Re-Re-Modified: (Previous No 658/2103/ 11-1 07-08) Construction of selective Lining and strengthening of structures near slab culvert on Nandur Madhmeshwar Branch Canal No 2 - Km 9 to 11. |
--- | Upto 16-05-2008 |
Upto 22-05-2008 |
NMCD, Vaijapur |
683/2101/2-2/08-09 |
Modified: (Previous No 646/2101/2-2/ 08-09)Construction of Approach Road Gut No 164/165 to Gut No 172 and CD works *(2nos) @ junction of Jaitpur Old Gaothan road to Jalgaon - Ghat Road Tal Kannad. |
--- | Upto 23-05-2008 |
Upto 30-05-2008 |
MID, Aurangabad |
682/2101/2-1/08-09 |
Modified: (Previous No 645/2101/2-1/ 08-09)Construction of Service Road from Pendgaon- Deulgaon Bazar road to water users association chowki from Ch o t0 870 m & from ch. 870 m to 1080 m, Tal. Sillod. |
--- | Upto 23-05-2008 |
Upto 30-05-2008 |
MID, Aurangabad |
681/2101/8-1/08-09 |
Construction of earthwork and structure of Tail Dy. on Wakod M.P. L.F. Canal, Tq. Phulambri, Dist. Aurangabad. | --- | Upto 16-06-2008 |
Upto 23-06-2008 |
MID, Aurangabad |
680/2101/7-1/08-09 |
Maintenance and cleaning premises of Bhagirathnagar colony and AIC premises. | --- | Upto 04-06-2008 |
Upto 09-06-2008 |
MID, Aurangabad |
679/3306/2-1/08-09 |
Work of excavation of Bore wells and fixing hand pumps @ new gaothans of (1) Deola Satona, (2) Revalagaon Hondegaon, (3) Wanjola, (4) RAniwahegaon Satona, (5) Raniwahegaon Partur (6) Vaijoda, (7) Mapegaon (kd), (8) Hatwan, (9) Shridhar Jawala. | --- | Upto 29-05-2008 |
Upto 31-05-2008 |
Lower Dudhna P. Div. Selu |
678/3306/1-10/08-09 |
Additional work of electrification of rehabilitated village Mapegaon (Kurd) Tal. Partur Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
677/3306/1-9/08-09 |
Additional work of shifting of 11 kv Line for Rehabilitation work at Salgaon Tal. Partur Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
676/3306/1-8/08-09 |
Additional work of electrification of rehabilitated village Shridhar Jawala Tal. Partur Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
675/3306/1-7/08-09 |
Additional work of electrification of rehabilitated village Wanjola Tal. Mantha Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
674/3306/1-6/08-09 |
Additional work of electrification of rehabilitated village Mangrul Tal. Mantha Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
673/3306/1-5/08-09 |
Additional work of shifting of 11 k.v. line for rehabilitation works at Raniwahegaon, Tal Partur, Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
672/3306/1-4/08-09 |
Additional work of electrification of rehabilitated village Raniwahegaon, Tal Partur, Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
670/3306/1-3/08-09 |
Additional work of shifting of HT Line for electrification of rehabilitated village Raniwahegaon 60%, Tal Partur, Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
671/3306/1-2/08-09 |
Additional work of shifting of L.T. Line (33 k.v. Sailu Partur) for Rehabilitation work at village Rani Wahegaon 60 % Tal. Partur Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
670/3306/1-1/08-09 |
Additional work of shifting of L.T. Line, HP Line & DTC for Rehabilitation work at village Wanjola Tal. Mantha Dist. Jalna. | --- | Upto 27-05-2008 |
Upto 30-05-2008 |
Lower Dudhna P. Div. Selu |
669/4110/1-1/08-09 |